My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-080-RES WHEREAS, the City of Paris, has need for professional services and Black & Veatch Engineers-Architects,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1984
>
1984-080-RES WHEREAS, the City of Paris, has need for professional services and Black & Veatch Engineers-Architects,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:16 PM
Creation date
6/3/2005 8:50:36 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1984
Doc Type
Resolution
CITY CLERK - Date
11/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.._~ <br /> <br />BLACK <br /> <br />Be <br /> <br />vEATCH <br /> <br />ENG'NEERS - ARCH'TECTS <br /> <br />TEL '214, 386-0001 <br /> <br />SUITE 3<X), S728lBJ FREEWAY <br />DALLAS, TEXAS 75240 <br /> <br />MAILING ADDRESS PO BOX NO 802004 <br />DAllAS. TEXAS 7':1380-2004 <br /> <br />CONTRACT FOR ENGINEERING SERVICES <br /> <br />THIS CONTRACT, between the City of Paris, Paris, Texas, hereinafter called the <br />CITY, and Black & Veatch Engineers-Architects, hereinafter ca11ed the <br />E~G 1NEER: <br /> <br />SECTION I - SCOPE OF SERVICES <br /> <br />The CITY hereby agrees to employ the ENGINEER to perform engineering <br />services in connection with the following improvements to the Master <br />Lift Station at the City's sewage treatment plant: <br /> <br />o Replace three existing pumps with larger units - <br />2 variable speed drive and 1 constant speed drive. <br /> <br />o Replace motor control center to accommodate <br />increased electrical load. <br /> <br />o Replace standby generator to accommodate <br />increased electrical load. <br /> <br />o Telemeter pump operational status to treatment <br />plant control room. <br /> <br />o Replace discharge piping and valves. <br /> <br />o Replace metal landings and stairs. <br /> <br />The ENGINEER agrees to perform engineering services for the project <br />including preliminary investigations; a basis of design memorandum; <br />construction drawings and specifications; construction phase services; <br />and supplemental services as requested. Description of the services <br />to be performed is provided in Appendix A. <br /> <br />SECTION II - COMPENSATION <br /> <br />For the services covered by this Contract, the CITY agrees to pay the <br />ENGINEER as follows: <br /> <br />A. For the Scope of Services covered in Appendix A, <br />Items A and B, salary times a multiplier of 2.75. <br /> <br />C-I <br /> <br />EXHIBIT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.