Laserfiche WebLink
pages 10 and I I of said contract, Lamar County Water Supply District <br />will discontinue watcr service to customers in the one described <br />property upon request by City. <br />6. Control of the sewer facilities to be conSLructcd by <br />W, E, Thompson shall be as follows: <br />(a) W. E. Thor-apson, his successors rind assigns, shall <br />Fame control of all sewer connections within the above described pro- <br />perty, provided, however, only domestic and commercial scwage shall <br />be permitted to enter the sewer lines. <br />(b) The control, of all sewer connections on the portion of <br />the line outside of the above described property shall be under the jolnt <br />control of W. E. Thompson, his successors and assigns, and the City. of <br />Paris unit July 1. 1980. During this period of time all sewer connections <br />on this portion of the line sFall be rnadc only on joint approval of the City <br />and IV, E. Thompson but the City shall receive all income on any cor.- <br />nections made on this portion of the line during this period. <br />(c) At the cxpii-akion of this period of time the City shall <br />thenceforth have full control of alt connection& on the portion of Ore Line <br />outside of Lhc abQvc described pretrisos, l7rovWcd, Fo-wevcr, that at no <br />time shall the City permit connections on the line that will impair %V, E. <br />Thompson, his successors and assigns, from hiving sewage trcat mcn, <br />for 1, 500, 000 gallons of metered waler per nionth is-orn the premists <br />above described, that is to say. %V, E, Thompson, his successors and <br />assigns, are guarantccd by the City, sewer treatment on 1, 500, DOC' <br />gallons of metered %vater per month from the above described premises, <br />and the City shall provide pumping facilities at the lift station at Pine <br />creek for customers perntitted on the line after it has sole control of <br />the line. <br />