Laserfiche WebLink
Bldder. IBEX Bullds 903-517-5491 <br />No 'DESCRIPTION <br />1 (TAPS & PERMITS <br />2 (TRASH CONTAINER <br />3 DEMO & HAUL OFF <br />4 DIRT WORK_ <br />5 DRAINAGE <br />6 SURVEYING <br />7 (CONCRETE SLAB <br />B PLUMBING <br />9 ELECTRICAL <br />10 I HVAC/VENTING <br />11 1 BUILDING MATERIAL <br />12 jFRAMFWGIABO4 <br />13 ROOFING <br />14 INSULATION <br />15 GYPSUM BOARD LABOR <br />16 QUARRY TILE BASE <br />17 TAPE, BED, PAINTING <br />18 CLEAN UP <br />19 (CONTRACTOR FEE <br />TOTAL BID PRICE <br />Altl DELETE QUARRY TILE BASE <br />IN LIEU OF WIDER SLAB LIP <br />iSMART LP SIDING IN LIEU OF <br />Alt2 HARDIE BOARD <br />4i;ANn4 <br />UNRPRICE <br />AID NOTEi <br />- <br />$ Assumed that associated City fees are waived <br />4.0 <br />810.00 <br />$ 3,240.00 Includes all SWPPP <br />1.0 <br />2,350.00 <br />$ 2,350.00 <br />20.0 <br />200.00 <br />$ 4,000.00 Select -fill grade In fill <br />120.0 <br />30.00 <br />$ 31600.00 <br />1.0 <br />13,375.00 <br />_ <br />$ 13,_375.00 Assumed that water and electric are sharing food truck pedestal <br />1.0 <br />20,347.04$ <br />_ <br />20,347.04 Assumed that water and electric are sharing food truck pedestal <br />2,537.64 -'$-' <br />­. $- 2,537.64 - <br />_1.0 <br />120.0 <br />86.72 <br />$ 10,406.21 <br />120.0 <br />33.33 <br />$ 4,000.0 <br />2.0 <br />_ <br />1,979.88 <br />- - <br />S 3,959.76 Color to be chosen ASAP <br />1.0 <br />750.00 <br />$ 7_50.00 - <br />1.0 <br />1_,350.0_0 <br />$ 1,350.00 <br />55.0 <br />30.00 <br />$ 1,650.00 <br />1.0 <br />4,055.12 <br />$ 4,055.12 Color to be chosen ASAP <br />1.0 <br />2,000.00 <br />$ 2,000.00 <br />4.0 500.00 $ 2,000.00 First 50% of Bid Price will be billed after framing and mechanical <br />inspections, final 50%will be billed afterfinal inspection <br />$ 79,620.77 <br />55.00 (30.00) $ (1,650.00) <br />1.00 (1,100.001 $ (1,100.00) <br />AI''I yV <br />Completion date 04/29/2023 <br />Erosion control needs to be installed <br />