My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
01 - JANUARY
>
January 23
>
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:10:21 PM
Creation date
1/19/2023 11:49:40 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBEX Builds <br />PO Box 1280 <br />Paris, TX 75461 <br />903-517-5591 <br />adam@Ibexbuilds.com <br />ADDRESS <br />City of Paris - Customer <br />1351 at S.E. Street <br />Paris, TX 75460 <br />ESTIMATE # 1348 <br />DATE 01/01/2023 <br />EXPIRATION DATE 01/09/2023 <br />COST CODE <br />LF"rCMT 7ha1'i <br />9 %.'' <br />0 0;7 <br />Ah ; U114T <br />Site Services <br />TAPS & PERMITS - assumed that associated City fees <br />0 <br />0.00 <br />0.00 <br />are waived <br />Site Services <br />TRASH CONTAINER - Includes all SWPPP <br />4 <br />810.00 <br />3,240.00 <br />Site Services <br />DEMO & HAUL OFF - <br />1 <br />2,350.00 <br />2,350.00 <br />Vertical <br />DIRT WORK - select -fill grade infill to be used <br />20 <br />200.00 <br />4,000.00 <br />Construction <br />Vertical <br />CONCRETE SLAB - per spec <br />120 <br />30.00 <br />3,600.00 <br />Construction <br />Vertical <br />PLUMBING - assumed that water and electric are <br />1 <br />13,375.00 <br />13,375.00 <br />Construction <br />sharing food truck pedestal <br />Vertical <br />ELECTRICAL - assumed that water and electric are <br />1 <br />20,347.04 <br />20,347.04 <br />Construction <br />sharing food truck pedestal <br />Vertical <br />HVACNENTING - per spec <br />1 <br />2,537.64 <br />2,537.84 <br />Construction <br />Vertical <br />BUILDING MATERIAL - per spec <br />120 <br />86.72 <br />10,406.40 <br />Construction <br />Vertical <br />FRAMING LABOR <br />120 <br />33.3333333 <br />4,000.00 <br />Constructlon <br />Vertical <br />ROOFING - colors to be chosen ASAP after contracting <br />2 <br />1,979.88 <br />3,959.76 <br />Construction <br />Vertical <br />INSULATION - per spec <br />1 <br />750.00 <br />750.00 <br />Construction <br />Vertical <br />GYP BOARD LABOR <br />1 <br />1,350.00 <br />11350.00 <br />Constriction <br />Vertical <br />QUARRY TILE BASE <br />55 <br />30.00 <br />11650.00 <br />Construction <br />Vertical <br />TAPE, BED, PAINT - colors to be chosen ASAP after <br />1 <br />4,055.12 <br />4,055.12 <br />Construction <br />contracting <br />Site Services <br />CLEAN UP - make ready for turn over after final <br />1 <br />2,000.00 <br />2,000.00 <br />Inspections <br />Contractor Fee <br />CONTRACTOR FEE - first 50% of Bid Price will be <br />4 <br />500.00 <br />21000.00 <br />billed after passing framing and mechanical <br />IBEX Builds accepts no liabilfty for structural design. We will not be responsible for displacement of the foundation due to ground movements <br />and changes of <br />the soil structure. These factors are beyond our control. We also recommend that the foundation be designed by a qualified <br />engineer to meet the requirements of the son conditions and structure loads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.