My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
01 - JANUARY
>
January 23
>
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:10:21 PM
Creation date
1/19/2023 11:49:40 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBullds903-517-5591 <br />Bldder.BFX <br />No 'NSCRIPTI60 <br />_ 4uAHm <br />UNIrPRICE <br />BID NCiES <br />1 1TAPS & PERMITS <br />- <br />$ Assumed that associated City fees are waived <br />2 ITRASH CONTAINER <br />4.0 <br />810.00 <br />$ 3,240.00 Includes all SWPPP <br />3 DEMO & HAUL OFF <br />1.0 <br />2,350.00 <br />$ 2,350.00 <br />4 DIRT WORK_ <br />20.0 <br />200.00 <br />$ 4,000.00 Select -fill grade in fill <br />5 DRAINAGE <br />$ <br />6 I- URVEYING <br />- <br />$ <br />7 1CONCRETESLAB <br />1_20.0 <br />30.00 <br />$ 3,600.00 <br />8 PLUMBING <br />1.0 <br />13,375.00 <br />_ <br />$ 13,375.00 Assumed that water and electric are sharing food truckpedestal <br />9 ELECTRICAL <br />1.0_ <br />20,347.04 <br />$ 20,347.04 Assumed that water and electric are sharing food truck pedestal <br />101HVAC/VENTING <br />1.0 <br />2,537.64 <br />$ 2,537.64 <br />31 (BUILDING MATERIAL <br />120.0 <br />86._72 <br />$ 10,406.21 <br />12 MING LABOR <br />120.0 <br />33.33 <br />$ 4,000.00 <br />13 ROOFING <br />2.0 <br />1,979.88 <br />$ 3,959.76 Color to be chosen ASAP <br />14 INSULATION <br />1.0 <br />750.00 <br />$ 7_50.00 <br />15 GYPSUM BOARD LABOR <br />1.0 <br />1,350.00 <br />$ 1,350.00 <br />16 IQUARRYTILE BASE <br />55.0 <br />30.00 <br />$ 1,650.00 <br />17 TAPE, BED, PAINTING <br />1.0 <br />4,055.12 <br />$ 4,055.12 Color to be chosen ASAP <br />18 CLEAN UP <br />1.0 <br />2,000.00 <br />$ 2,000.00 <br />19 CONTRACTOR FEE <br />4.0 <br />500.00 <br />$ 2,000.00 First 50% of Bid Price will be billed after framing and mechanical <br />inspections, final 50% will be billed after final inspection <br />TOTAL BID PRICE <br />$ 79,620.77 <br />DELETE QUARRY TILE BASE <br />AIt1IIN LIEU OF WIDER SLAB LIP 55.00 <br />AIt2 iSMART LP SIDING IN LIEU OF 1.00 <br />HARDIE BOARD <br />Completion date 04/29/2023 <br />Erosion control needs to be installed <br />(30.00) $ (1,650.00) <br />(1,100.00) $ (1,100.00) <br />�P <br />
The URL can be used to link to this page
Your browser does not support the video tag.