My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
01 - JANUARY
>
January 23
>
18-19 - Bid & Contract for construciton of permanent restrooms in Downtown Farmer's Market with Adam Bolton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:10:21 PM
Creation date
1/19/2023 11:49:40 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBEX Builds <br />PO Box 1260 <br />Paris, TX 75461 <br />903-517-6591 <br />adam@bexbuilds.com <br />ESTIMATE # 1346 <br />DATE 01/01/2023 <br />EXPIRATION DATE 01/09/2023 <br />COSTCODE <br />0E.Cli ,11 IP10f111 <br />01y <br />VL'r -B— <br />AMOUi`kIT <br />Site Samces <br />TAPS & PERMITS - assumed that associated City fees <br />0 <br />0.00 <br />0.00 <br />are waived <br />She Services <br />TRASH CONTAINER - includes all SWPPP <br />4 <br />310.00 <br />3,240.00 <br />Site Senticas <br />DEMO & HAUL OFF - <br />1 <br />2,350.00 <br />2„350.00 <br />Vertical <br />DIRT WORK - select -fill grade infill is be used <br />20 <br />200000 <br />4,000®00 <br />Construction <br />vertical <br />CONCRETE SLAB - per s <br />120 <br />30.00 <br />31600.00 <br />construction <br />Vertical <br />PLUMBING - assumed that water and electric are <br />1 <br />13,375.00 <br />13.375.00 <br />Construction <br />sharing food truck pedestal <br />Ver#cal <br />ELECTRICAL - assumed that water and electric are <br />1 <br />20,347.04 <br />20,347.04 <br />Can aloe <br />sharia food truck pedestal <br />Vertical <br />HVACIVE INKS - per spec <br />1 <br />2,537.64 <br />2„537.64 <br />Construon <br />Vertical <br />BUILDING MATERIAL - per spec <br />120 <br />36.72 <br />10,406.40 <br />Construction <br />Vertical <br />FRAMING LABOR <br />120 <br />333333333 <br />4,000.00 <br />Construction <br />Vertical <br />ROOFINGcolors to be chosen ASAP after contracting <br />2 <br />1,979.66 <br />3,959.76 <br />Construction <br />Vertical <br />INSULATION - per spec <br />1 <br />750°00 <br />7160.00 <br />Construction <br />vsrdcal <br />GYPBOARDLABOR <br />I <br />1,350.00 <br />1,350.00 <br />Construction <br />Vertical <br />QUARRY TILE BASE <br />55 <br />30.00 <br />1,650.00 <br />Construction <br />Verlicall <br />TAPE, BED, PAINT - colors to be chosen ASAP after, <br />1 <br />4,055.12 <br />4,055.12 <br />Gonstrucdon <br />co wing <br />Sita Services <br />CLEAN BJP - maks ready for turns over after final <br />1 <br />2,000°00 <br />2,000.00 <br />inspections <br />Contractor Fee <br />CONTRACTOR FEE - ffrst 50V6 of Bid Price will be <br />4 <br />500°00 <br />2,000.00 <br />billed after passing framing and reach ical <br />IBEX Builds accepts no liability for structural design. We will not be responsible for displacement of the foundation due Ito ground movements <br />and changes of <br />the sail structure. These factors are beyond our control, We also recommend that the foundation be designed by a qualified <br />engineer to most the requirements of the sail conditions and structure loads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.