Laserfiche WebLink
Image 19: Love Civic Center Entrance flowing at capacity on June 14, 2023. <br />Public Works has done an excellent job with this type of channel improvement. This method could <br />be used throughout the city if staffing were available. A dedicated drainage crew has been <br />proposed for Public Works, and the Engineering Department fu11y supports that, <br />Recommendations: <br />Upon my initial review of the situation, I recommend that the city: <br />1) Further explore expanding the sizes of some channels in strategic locations. <br />2) Clean out the channels of significant obstacles and debris. <br />3) Build detention ponds in key locations. <br />4) Utilize city staff to perform this work as soon as possible, contracting out where needed. <br />5) Continue proper enforcement of drainage detention through our subdivision ordinances. <br />Improve ordinance language where necessary. <br />6) Conduct Lidar laser survey citywide to capture existing topography and aid in future <br />studies. <br />Regarding #1: Channel reconstruction and widening from the downstream end up toward the top <br />of the basin should be pursued. While this will take significant financial resources, there is some <br />work that we believe in-house crews can perform to help alleviate the situation. Care should be <br />taken to not make flooding worse downstream as each channel is analyzed for possible widening. <br />Regarding #2: There is some work that we believe in-house crews can perform to help alleviate <br />the situation. <br />18 <br />