Laserfiche WebLink
The following Table is a listing of all of the significant capital outlay and improvement requests that have been added <br />to the Proposed FY23/24 Budget. <br />and <br />and <br />ig and C_ollecti <br />ig and Collecti <br />Council <br />Council , <br />Council <br />Iia <br />"nffi U'N der vti <br />Code Enforcement <br />Code Enforcement <br />Code Enforcement <br />Community Develo <br />EMS <br />EMS <br />EMS <br />EMS <br />Line Item Description <br />Payroll Lines Assistant Finance_ Director <br />01-0408-21-00 Flag Pole & Flags <br />04-0915-61-98 AWOSUpgrade <br />.. ............_.._..-- ...._........._...... <br />04-0217-61-00 61-00 Furniture Replacement <br />Payroll Li Reader <br />Lines Meter <br />....-..es m.�_. -- <br />10-1002-81-99 Meter Reading Truck <br />O1-0350-11-00 Housing Assessment <br />04-0310-11-00 1Belford Demolition <br />04-0401-11-00 (Grand Theater <br />Pavroll lines Publie Information Officer <br />Payroll Lines Assistant City <br />01-1002-40-02 Mower _ <br />04-1004-40-02 1/2 Ton Truck <br />04-1004-40-02 UTV <br />Pavroll Lines Secretary <br />Payroll Lines Crewmembers (x3) <br />O1-0318-54-00 PCG Contract - Medicare <br />05-0209-54-00 IV Pumps <br />05-0211-54-00 Jump Kits <br />EMS <br />05-0211-54-00 <br />'Zoll ZVents <br />EMS <br />05-0401-54-00 <br />(Eastside Floor'ing <br />Engineering <br />01-0321-41-00 <br />Lida rSurvey <br />Structural Analysis - Depot <br />Engineering <br />04-0318-41-00 <br />Building <br />Fire <br />01-1005-32-99 <br />Fire Marshall Truck <br />Fire <br />01-0221-32-00 <br />Radios <br />Fire N/A Ladder Apparatus Replacement <br />IT 01-0210-89-01 Citch <br />crosoft365 <br />IT 05-0510-89-01 and Server Replacement <br />Library_ 01-0402-64-00 Roof Repairs <br />Library 01-0216-64-00 Furniture Replacement <br />Lift Station 05-0510-87-00 Lift Station IT Infrastructure <br />Notes <br />See Budget Message. Salary and Benefits. <br />Citv Hall Flae Dole and flaes. <br />$ 125,000.00 TxDOT 90/10 grant project to replace aging AWOS system. <br />$ 5,000.00 Replace aging furniture in terminal. <br />$ 42,000.00 see Budget Message salon and Be <br />nefats. <br />$_40,000.00 Truck for new Metter Reader. ______ <br />$ 65,000.00 Phase II of Housing Assessment Study. 1 <br />$1000000.00 Dem. -o.._... ._. y. <br />olition of Belford Building- Public Safety. <br />Phase II - Cleanup and Asbestos Abatement. City -owned <br />$ 100,000.00 building._ <br />$ 76,000.00 (See Budget . .. y <br />g Message. salary a and Benefits. <br />See Budget Message. Salary and Benefits. Spread out <br />$ 160,000.00 across Depts. 12, 82, and 86 Unbudget Dir. of Utilities. <br />$W 12,600.00 Nuisance abatement, replace aging mower. <br />$ 40,000.00 Replace aging vehicle for code enforceme _ <br />nt officer. <br />Replace aging equipment for better nuisance abatement <br />$ 16,000.00 access. <br />$ 39000.00 See Budget -.. . _Benefits._ <br />Mee ....ssage. Salary and <br />See Budget Message. Salary and Benefits. Note: This <br />$ 195,000.00 expense does not reflect net difference from PT. <br />_Pe rexistmgcontract, Medicare regulations require surveymm <br />$ 35,000.00 completion. <br />$ 20,000.00 Better IV man _....... <br />_ agement and timing. <br />Reorganize existing personnel bags for�ww <br />greater ease and <br />$ 10,000.00 less strain. <br />................ <br />Medical equipment, fourtrucks .w...__ <br />have been outfitted, need <br />$ 45,000.00 to finish the final three. <br />$ 8,801 00 ',Rehabilitation <br />of flooring <br />Countour mapping of city, 8 shots per meter. Will help <br />$ 34,000.00 :with drainage, floodplain, developer, surveys, etc. <br />�. ........... _ <br />Aging building, cracking occuring, need to determine if <br />$ 38,000.00 structural issues exist. City -owned building. <br />$ 90,000.00 Replace aging Fire Marshal Truck. <br />$ 23,000.00 Radio replacement. <br />........... ..r................ <br />Funding set aside for future purchase of $2.2 million ladder <br />$1,500,000.00 apparatus. 2+ year lead time for delivery. <br />--_1._- .... <br />Annual_, ,- _— <br />expense. Current software support ends October <br />$ 55,000.00 2023. Shifting from server based to cloud based. <br />-.111".."1111111111 <br />Switches connect offices to network, 12+ old and <br />$ 43,000.00 failing. Servers also aged and failing. <br />$ 10,000.00 Misc roof repairs. <br />$ 45,000 00 Replace existing aging furniture throughout building. <br />Current radio failed, using borrowed radio. Needed to <br />$ 16,000.00 maintain offsite connection to liftstation. <br />Page 20 of 23 <br />