My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 - Agreement with Garver to Perform Lead Service Line Inventory
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
10 - OCTOBER
>
October 23
>
15 - Agreement with Garver to Perform Lead Service Line Inventory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 11:29:46 AM
Creation date
10/19/2023 11:29:24 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
communications firm foir LCRR, and, if avaiillalblev ILCIRII, compliance. <br />3. Garver willll facilitate one (1) virtual) workshop to (provide updates on Garver -Red tasks and <br />any regulatory developments and receive status updates on City lied tasks. <br />4,. Garver wiill facilitate one (1) viirtuall staff training session on communications materials <br />and delivery schedules. <br />Dellnrerables° Review comments on existing LCR materials, review comments on newly <br />developed communications materials. <br />ID. Task VIII Subsurface Utility Engineering (Optional) <br />1. Garver wRlll (provide field work supervision of the City's utiiRity Ilocatiion field crew and <br />Subsurface Utility Engineering (SUE) Quality Il...evei (CII...) 1:3 rmarkiings to identify Ihodzontal <br />(locations for the test holes. <br />2. Garver will perform one (1) CIL A SLOE test Iholle on the city side of the irneteir Ibox and one <br />(1) CII... A SUE test Iholle on the customer side ofthe meter box to determine the location <br />and rmateriiall type of the service )nines. <br />3. Garver will survey each test We using the established project control point data. Any <br />necessary lRiiglht-of (Entry (ROE) permits, including railroad IFRCIE, will Ibe Iproviided by the <br />City prior to starting the field work. <br />4. rest holes Wil be prioritized outside of paved areas wherever possiibie.. IHowever, some <br />test Iholles may meed to be placed in paved areas that may require traffic control) <br />measures. Garver will establish routineford'inary traffic control whenever required. If non <br />routine traffic control) measures are irequired, Garver will utilize a traffic control) provider <br />at the unit rate provided in the Appendix IF3.. <br />5.. Garver will) utiize non -.destructive vacuuirm excavation equipment to excavate test holies <br />at the required locations. gest We excavations wiillll be Ibackfilled with aplprolpriate <br />material and the original surface willll be restored.. The (backfill will) be compacted in lifts <br />by rmechanicall means to mitigate future settRerment. <br />Defiverableso Summary of test bole coordinate data and a CARD tale containing CL A SUE <br />data. <br />VIA 0 0 FA MT W1 / f <br />The following Rteirms are not iincluded under this agreement but will The considered as extra work„ <br />1.. Polpuiating the service line inventory. <br />2. Sampfing or water quality analyses.. <br />3. Deveiolpirnent of a (list of schools and RTicensed child. --care facilities. <br />4,. Estimation of labor costs for City staff.. <br />5. Design services of any kind.. <br />6. SubmMals or dehveralbies in addition to those listed herein. <br />Garver shall (begin work under this Agreement within tern (10) callendair days of the Notice to Proceed <br />for each task and shaill complete the work in accordance with the schedule (bellow. It is assumed that <br />9 Version 1 <br />Paris Lead and Copper Rule Assistance Garver Project No. 2302035 <br />
The URL can be used to link to this page
Your browser does not support the video tag.