Laserfiche WebLink
the north side of the property is to remain in place for historical purposes. The height of this wall <br />is approximately 8 feet. <br />STATUS OF ISSUE: <br />On July 17, 2023, a Request for Proposals was first published in The Paris News to start the bidding <br />process to demolish the buildings. Six (6) bids were received, these were opened on September <br />15, 2023 at 3:15 PM. Bids received for the work ranged from $262,588.12 to $1,004,655.00. A <br />committee of Todd Mittge, City Engineer, and Jason Hart, Structural Engineer/project designer, <br />evaluated the bids utilizing a comprehensive scoring system. Based upon scoring of the submittals, <br />Lloyd D. Nabors Demolition, LLC, located in Hutchins, Texas, is recommended for award of the <br />project. The Scoring Tabulation, with the complete list of bidders, is attached. <br />This scoring system was based on the following: <br />Evaluation Criteria (ref. Specifications, Item 102, page 5) <br />1 Ability to meet specifications and provide services as set forth in 20% <br />the RFP <br />2 CONTRACTOR's past experience working with local5 <br />0 <br />governments /o <br />3 Qualifications of the CONTRACTOR and the CONTRACTOR's 20% <br />project leader <br />4 Proposed project cost 50% <br />5 Reference checks 5% <br />Based upon previous project experience, completing a site inspection of the properties, <br />qualifications of the project manager, and their ability to meet specifications, the evaluation <br />committee members, each independently, recommended Lloyd D. Nabors Demolition, LLC be <br />awarded the project as the lowest responsible bidder, a result of their demolition experience in <br />urban environments and offering the best value for the scope of work. <br />Lloyd D. Nabors Demolition, LLC base bid is $493,500.00, with an additional cost of $94,500.00 <br />to retain the north wall per terms of the agreement with SMA, for a total of $588,000.00 for the <br />project. Lloyd D. Nabors Demolition, LLC included in their submittal the options for retention of <br />the north wall. <br />