Laserfiche WebLink
I w1mungo '101����ri� <br />»�Jlllll J Ilil�16� 4111����1��ll�,l11 "�Ymo <br />The water supply for Forestbrook Estates will be supplied by facilities that are <br />owried and operated by the City of Paris through offsite connections to existing <br />water lines. The developer will construct all water distribution facilities to serve the <br />development <br />The Improvement Area No. I infrastructure proposed is approxiiriately3,221 <br />linear feet of 8 -inch residential waterline and 2,619 linear feet of 10 -inch <br />residential water line. Valves and flushing valves are provided at intervals as <br />required by the engineering plans approved by the City of Paris. A residential <br />water infrastructure layout is shown in Ext 5A & W <br />d) Sanitary Sewer System <br />The wastewater generated by the development will flow by gravity main through th,4 <br />internal sanitary sewer collection system and will be routed to an existin,#; <br />Asite City of Paris sanitary sewer main. <br />M1 W nt W WOR M, 1, <br />The storm water runoff within the PID will be collected by inlets along the <br />concrete curb and gutter street system and routedthrough an underground storm <br />drain system of high, -density polyethylene (HDPE) pipe- The Improvement Area No. 1 <br />infrastructure proposed is approximately 1,005 linear feet of 15 -inch to 424rich <br />residential HDPE storm drain. The residential storm infrastructure Layout is shown in <br />Exhibit 7. <br />.. .. . ....... ...... ........ <br />FORESTBROOK PUBLIC IMPROVEMENT DISTRICT NO, 1 <br />CERVICE AND ASSESSMENT PLAN 54 <br />