My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
City-of-Paris
>
City Council
>
Agenda Packets
>
2025
>
07-14-2025
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 12:25:51 PM
Creation date
7/10/2025 12:23:10 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acting in its legislative capacity and based on information provided by the Developer and its <br />engineer and reviewed by the City staff and by third -party consultants retained by the City, the <br />City Council has determined that the costs related to the Authorized Improvements shall be <br />allocated as follows: <br />■ The costs of the Major Improvements shall be allocated to Improvement Area #1 and the <br />Remainder Area based upon Estimated Buildout Value of each Parcel or Assessed <br />Property to the Estimated Buildout Value of the District. Currently, the Remainder Area is <br />allocated 70.10% of the Major Improvements costs, and Improvement Area #1 is <br />allocated 29.90% of the Major Improvements costs. The Remainder Area and <br />Improvement Area #1's shares of the Major Improvement costs are illustrated in Exhibit <br />B-2. <br />■ The costs of the Improvement Area #1 Authorized Improvements shall be allocated to <br />each Parcel within Improvement Area #1 based on the ratio of the Estimated Buildout <br />Value of each Parcel designated as Improvement Area #1 Assessed Property to the <br />Estimated Buildout Value of all Improvement Area #1 Assessed Property. Currently, the <br />Improvement Area #1 Initial Parcel is the only Parcel within Improvement Area #1, and as <br />such, the Improvement Area #1 Initial Parcel is allocated 100% of the Improvement Area <br />#1 Authorized Improvements. <br />B. Assessments <br />The Improvement Area #1 Assessment will be levied on the Improvement Area #1 Initial Parcel <br />in the amount shown on the Improvement Area #1 Assessment Roll, attached hereto as Exhibit <br />F-1. The projected Improvement Area #1 Annual Installments are shown on Exhibit F-2 and are <br />subject to revisions made in the any Annual Service Plan Update. Upon division or subdivision of <br />the Improvement Area #1 Initial Parcel, the Improvement Area #1 Assessment will be reallocated <br />pursuant to Section VI. <br />The Maximum Assessment for each current Lot Type is shown on Exhibit E. In no case will the <br />Assessment for Lots classified as Lot Type 1 exceed the corresponding Maximum Assessment for <br />each Lot Type classification. <br />C. Findings of Special Benefit <br />Acting in its legislative capacity and based on information provided by the Developer and its <br />engineer and reviewed by the City staff and by third -party consultants retained by the City, the <br />City Council has found and determined the following: <br />■ Improvement Area #1 <br />„ ................... <br />K PUBLIC IMPROVEMENTDISTRICT <br />SERVICE wASSESSMENT ► <br />
The URL can be used to link to this page
Your browser does not support the video tag.