My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/09/2025 Minutes
City-of-Paris
>
Boards and Commissions
>
TIRZ BOARD
>
2025
>
10/09/2025 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 5:11:13 PM
Creation date
1/8/2026 5:10:53 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
raaxu ooxw'amo�weam/g^ <br />^ Development n/phasing and implementation plan. <br />» Tourincluded inVision Paris Guide. <br />° Development of one (1) opinion of probable construction cost for Two-way Restoration, Town Square, <br />and Market Square. <br />" Development ofone (1)prioritization matrix. <br />^ <br />^ <br />SCHEHIKIE <br />After receipt of a notice to proceed, a 6 -month planning and guide development'sChedule was ariti.pipated for <br />scoping purposes. This schedule does not include City of Paris and TOOT review and approvbiltimia, only <br />allowed planning time. It is anticipated that the project schedule will be dispOssiad and agreed upon -during the <br />kickoff meeting. <br />The following lump sum costs are presented by task and are inclusive of le'bor, overhead, and profit. <br />Vision Parils� Guide Fee <br />Task Fee <br />Task 1 Project Management <br />Task u Existing Plan Rmv <br />Task Coordination <br />Task Vision Paris <br />Task 1 Phasing andl;molem <br />. and Data Collection <br />-04=o�uu <br />��40.00 <br />$3,360,00 <br />$3s.R^O.00 <br />$4,480.00 <br />Total Lump Sum Cost $48,520.00 <br />Direct Expenses: <br />Cost Plus 10%: <br />)) Printing and color presentation materials <br />A Travel (transportaWn, lodging) <br />A Meals <br />Mileage: $0.701mile �,Ourrent Federal Rate) <br />Lambka Associatel(s whl provide backup data for all direct expenses submitted. <br />" The project will be billed onepercent complete basis once per month for the duration ofthe project. <br />Any additional services requested, o,changes oothe approved plan/design after contract document production <br />has begun will be considered an additional service and fee and require written authorization and approval by both <br />parties. <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.