Laserfiche WebLink
(d) will not materially impair existing or future residential, commercial, retail, mixed-use, <br />public, institutional, park, open -space, or agricultural development areas; <br />(e) will not prematurely convert land needed for orderly future growth, commercial <br />development, residential development, public infrastructure, or community facilities; <br />(f) has adequate access for fire, emergency medical services, police, public works, <br />utility, and emergency response; <br />(g) has or will provide adequate stormwater, drainage, transportation, and public <br />infrastructure; <br />(h) provides sufficient information regarding electric interconnection, electric <br />infrastructure, substations, transformers, inverters, collection lines, transmission <br />facilities, BESS, if applicable, and related accessory infrastructure; <br />(i) adequately mitigates glare, visual impacts, fencing impacts, lighting, noise, drainage, <br />vegetation, maintenance, security, traffic, and operational impacts; <br />0) complies with DSM -001; <br />(k) complies with the City's adopted BESS requirements when BESS is proposed; <br />(1) complies with the City's adopted construction codes, fire code, electrical code, <br />property maintenance code, Technical Standards Manual, Engineering Standard Details <br />Book, utility standards, and other applicable technical standards; <br />(m) provides acceptable decommissioning, site restoration, and financial assurance <br />provisions as required by DSM -001; and <br />(n) will not otherwise be detrimental to the public health, safety, or general welfare. <br />29.8 DSM -001 adopted as standards for SUP* review. <br />(a) DSM -001 is adopted by reference as the City's Utility -Scale Solar Energy Facilities <br />Development Standards Manual and shall apply to all Utility -Scale Solar Energy <br />Facilities regulated by this subsection. <br />(b) DSM -001 may include application requirements, design standards, use standards, <br />review procedures, submittal checklists, technical study requirements, infrastructure <br />requirements, emergency response requirements, BESS coordination requirements, <br />construction standards, inspection requirements, maintenance requirements, <br />decommissioning requirements, financial assurance requirements, annual reporting <br />forms, and other administrative or technical standards necessary to implement this <br />subsection. <br />