Laserfiche WebLink
(c) DSM -001 shall have the force and effect provided by the adopting ordinance and this <br />subsection, except that DSM -001 shall not independently authorize a land use, create a <br />zoning district, amend the Land Use Matrix, waive a SUP* requirement, allow a Utility - <br />Scale Solar Energy Facility in the Agricultural (A) District, or authorize a Utility -Scale <br />Solar Energy Facility in any district where such use is not eligible under this subsection. <br />(d) Where this subsection and DSM -001 conflict, this subsection shall control as to <br />zoning district eligibility, SUP* requirements, legislative approval criteria, and land use <br />authorization. <br />29.9 BESS coordination. <br />(a) Any BESS associated with a Utility -Scale Solar Energy Facility shall comply with the <br />City's adopted BESS ordinance, BESS manual, fire code, building code, electrical code, <br />and all applicable state and federal requirements. <br />(b) A Utility -Scale Solar Energy Facility and associated BESS proposed as one <br />integrated project may be reviewed through one SUP*, provided the SUP* application <br />includes the BESS component and the BESS is accessory to the Utility -Scale Solar <br />Energy Facility. <br />(c) A separate SUP may be required if the BESS is proposed as a principal use, is <br />added after SUP* approval as a material change, serves a use other than the Utility - <br />Scale Solar Energy Facility, materially increases site impacts, or otherwise requires <br />separate approval under the City's BESS regulations or the SUP* conditions. <br />29.10 Administration. <br />(a) This subsection and DSM -001 shall be administered by the City Manager or <br />designee in coordination with the Building Official, City Planner, City Engineer, Fire <br />Marshal, Public Works Director, and other affected City departments. <br />(b) The City Manager or designee may issue written interpretations, forms, checklists, <br />routing procedures, and administrative guidance necessary to implement this <br />subsection and DSM -001. <br />(c) Any interpretation under this subsection shall not authorize a use prohibited by this <br />subsection, waive a SUP* requirement, allow a Utility -Scale Solar Energy Facility in the <br />Agricultural (A) District, or alter zoning district eligibility. <br />29.11 Decommissioning, discontinuance, and site restoration. <br />(a) Each Utility -Scale Solar Energy Facility shall comply with the decommissioning, <br />discontinuance, abandonment, site restoration, and financial assurance requirements <br />established in DSM -001 and any SUP* conditions. <br />