Laserfiche WebLink
(b) A Utility -Scale Solar Energy Facility SUP* may require a decommissioning and site <br />restoration plan addressing discontinued operations, obsolete equipment, panels, <br />racking, foundations, piles, wiring, inverters, transformers, substations, BESS, access <br />roads, fencing, environmental conditions, site restoration, revegetation, infrastructure <br />proposed to remain, and financial assurance. <br />(c) No discontinued or abandoned Utility -Scale Solar Energy Facility shall be converted <br />to another principal use unless the proposed use is permitted in the zoning district or <br />approved by rezoning, SUP amendment, site plan approval, or other required City <br />approval. <br />(d) The City may require financial assurance for decommissioning, site restoration, <br />environmental remediation, infrastructure removal, or site stabilization where authorized <br />by law and approved as part of the SUP*. <br />29.12 Material changes. <br />(a) A material change to an approved Utility -Scale Solar Energy Facility shall require <br />review and approval before implementation. <br />(b) Material changes may include, but are not limited to: <br />1. expansion of project area; <br />2. increase in approved generating capacity; <br />3. addition or expansion of BESS; <br />4. addition or relocation of substations, transformers, inverters, collection facilities, <br />or transmission facilities; <br />5. change in access, fire lanes, emergency response layout, or site circulation; <br />6. change affecting buffers, screening, landscaping, adjacent properties, drainage, <br />or public rights-of-way; <br />7. change in phasing or site layout; <br />8. change in ownership, operator, or party responsible for decommissioning or <br />financial assurance; or <br />9. any other change determined by the City Manager or designee to materially <br />affect the basis for approval. <br />(c) Depending on the nature of the material change, the City may require administrative <br />approval, site plan amendment, building permit, fire permit, electrical permit, utility <br />approval, SUP* amendment, or new SUP*. <br />29.13 Enforcement. <br />(a) It shall be unlawful to construct, operate, expand, alter, convert, decommission, <br />abandon, or materially change a Utility -Scale Solar Energy Facility in violation of this <br />subsection, DSM -001, an approved SUP*, an approved site plan, an approved <br />