My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-141-RES WHEREAS, CITY COUNCIL DID HERETOFORE ONTHE 8TH DAY OF JUNE eretofore, on the 8th day of June,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1998
>
1998-141-RES WHEREAS, CITY COUNCIL DID HERETOFORE ONTHE 8TH DAY OF JUNE eretofore, on the 8th day of June,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:55 PM
Creation date
3/6/2006 2:42:34 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1998-141-RES
Doc Type
Resolution
CITY CLERK - Date
9/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(e) The Financial Closing shall have occurred. <br /> <br />ARTICLE III <br />PURCHASE AND SUPPLY OF RAW WATER <br /> <br />Section 3.01. Purchase and Supply of Raw Water. The City agrees to make available for sale to Panda <br />at the Supply Delivery Point up to eight (8) million gallons per Day of Raw Water from the Source and Panda agrees <br />to purchase from the City all or part of such Raw Water, subject to the terms and conditions set forth herein. The <br />City shall deliver the Raw Water to Panda at the Supply Delivery Point through one or more Meters, which will <br />measure the volume delivered. All Raw Water delivered hereunder shall be delivered at a maximum pressure of 60 <br />pounds per square inch. The Raw Water shall be owned by the City until it is delivered to the Supply Delivery <br />Point, and thereafter the Raw Water shall be owned by Panda. The Raw Water shall be used by Panda at the Plant in <br />connection with the generation of electricity, including, without limitation, as cooling water for the cooling towers <br />associated with the Plant. Panda shall not permit any Raw Water furnished hereunder to be used to supply any other <br />Person for use other than in regard to the operation of the Plant without specific approval of the City. <br /> <br />Section 3.02. Commencement of Delivery. Panda shall notify the City at least thirty (30) days in <br />advance of when it desires the City to commence the initial delivery of Raw Water to the Supply Delivery Point for <br />purchase and sale hereunder; provided that such delivery shall commence no earlier than October 1, 1999 and no <br />later than the Commercial Operations Date. Notwithstanding anything contained herein to the contrary, in no event <br />will Panda be obligated to purchase Raw Water hereunder until the Commercial Operations Date. <br /> <br />Section 3.03. Quantity. The City agrees to deliver to Panda, at the Supply Delivery Point, the quantity <br />of Raw Water requested by Panda (up to and including eight (8) million gallons per Day). To facilitate this process, <br />the City and Panda shall cooperate and coordinate in the control of the equipment that regulates the delivery of Raw <br />Water pursuant to this Agreement. <br /> <br />ARTICLE IV <br />COLLECTION AND TRANSPORT OF W ASTEW A TER <br /> <br />Section 4.01. Wastewater Collection. <br /> <br />Process Wastewater from the Plant will be collected, transported, and treated by the City in a manner to be <br />separately agreed on by Panda and the City. Domestic Wastewater (sewage) will be collected and treated by the <br />City in accordance with City Ordinances separate and apart from process Wastewater. The Parties agree to use their <br />best efforts to promptly reach an agreement on all such Wastewater matters so that the City may be able to <br />commence the collection of the process Wastewater contemporaneous with the delivery of Raw Water hereunder (in <br />order to facilitate Panda's testing of the Plant's operations). <br /> <br />ARTICLE V <br />CONSTRUCTION OF PIPELINE; WASTEWATER FACILITIES <br /> <br />Section 5.01. Construction of the Pipeline; Transfer. Panda agrees at its sole cost and expense to <br />design, engineer, survey, construct and install the Pipeline in accordance with the terms and conditions contained <br />herein. The Pipeline shall be designed, sized and constructed to transport and supply up to eight (8) million gallons <br />per Day of Raw Water from the Source to the Supply Delivery Point and otherwise permit the City to perform its <br />obligations hereunder (subject to the provisions of Section 5.09 herein). The Pipeline shall be designed, engineered, <br />and constructed in compliance with all TNRCC and EP A Regulatory Requirements for a potable water pipeline. <br />Furthermore, the Pipeline shall be designed, engineered and constructed so that it conforms with and connects to any <br />other applicable pipelines and related facilities of the Plant. Upon completion, Panda shall transfer title and <br />ownership of the Pipeline to the City in consideration of any grant funds obtained by the City for such purpose and <br />ten dollars ($10). <br /> <br />Section 5.02. Alternate Construction of the Pipeline by PEDC; Transfer. The Parties agree that, if <br />Panda so determines, the PEDC may design, engineer, survey, construct and install the Pipeline pursuant to a <br />separate written agreement which may be entered into between PEDC and Panda. Upon completion, PEDC will <br /> <br />.3. <br /> <br />G:\A TTORNEY\Scott\Current Work\water agr - finaLdoc3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.