My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-141-RES WHEREAS, CITY COUNCIL DID HERETOFORE ONTHE 8TH DAY OF JUNE eretofore, on the 8th day of June,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1998
>
1998-141-RES WHEREAS, CITY COUNCIL DID HERETOFORE ONTHE 8TH DAY OF JUNE eretofore, on the 8th day of June,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:55 PM
Creation date
3/6/2006 2:42:34 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1998-141-RES
Doc Type
Resolution
CITY CLERK - Date
9/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />transfer title and ownership of the Pipeline to Panda in exchange for cash consideration equal to the PEDC's cost <br />therefor, less the amount of any grant funds the PEDC may obtain for such purpose. Panda will transfer title and <br />ownership of the Pipeline to the City promptly thereafter. <br /> <br />Section 5.03. Required Completion Date. Panda shall notify the City of the date of Financial Closing on <br />or before such date. The construction of the Pipeline shall be completed such that the City is able to perform its <br />obligations hereunder. <br /> <br />Section 5.04. Location ofPipeline~ Costs. The Pipeline shall be constructed along the route described in <br />Schedule 3 attached hereto and made a part hereof. The City shall fully cooperate and support Panda's (or PEDC's) <br />efforts to obtain any rights-of-way; provided, however, that in the event the alignment includes land owned by the City <br />after the date of this Agreement, the City agrees to grant Panda any easement, right-of-entry or other permission <br />necessary to utilize such land for the construction of the Pipeline at no additional cost to Panda, provided that any such <br />easement, right-of-way or permission shall be non-exclusive. In addition, if any additional land, easement, right-of-way <br />or property interest must be acquired to permit the construction of the Pipeline, the City agrees to negotiate and, if <br />necessary, exercise its powers of eminent domain to acquire any such land, easemen~ right-of-way or property interest. <br />All costs associated with the construction of the Pipeline shall be paid by Panda (or PEDe) using certain of the proceeds <br />from the Financial Closing. Such costs shall include, but not be limited to design, engineering, surveying, construction, <br />labor and the cost of all materials. Panda also agrees, if applicable, to pay to the City any permit processing fees, and <br />post any performance or labor and material bonds normally required. <br /> <br />Section 5.05. Meters. The supply of Raw Water pursuant to this Agreement shall be measured by an <br />appropriate recording flow Meter(s) specified by the City and agreed to by Panda, with such Meter being installed as <br />specified by the City and agreed to by Panda, which includes a flow versus time recording device and a pressure versus <br />time recording device, which shall be located at the Supply Delivery Point. Should Panda request that such Meter be <br />replaced by a larger Meter, such replacement meter and all costs for the installation of the same shall be borne by Panda <br />(separate and apart from any Raw Water charges pursuant to Section 7.01 and from any charges set forth in Section <br />6.02.) <br /> <br />Section 5.06. Progress Reports and Observation Visits. From the date of Financial Closing until the <br />completion of construction of the Pipeline, Panda (or PEDe) shall keep the City informed in writing on a quarterly <br />basis of the status of the construction project and an estimated schedule for completion of the project. In addition, <br />Panda (or PEDe) shall promptly notify the City of the occurrence of any incident which will or is reasonably <br />expected to result in a material delay in the construction schedule. Panda (or PEDe) shall comply with all <br />reasonable requests of the City for, and assist in arranging, any such observation visits to the Pipeline sites. The <br />City shall have the right to provide a full time inspector. Any work not in compliance with the plans and <br />specifications as provided to the City by Panda, will be reported to the City Engineer, then to Panda. <br /> <br />Section 5.07. Testing. The Parties will cooperate with each other in coordinating schedules and <br />providing reasonable assistance in connection with the testing of the Pipeline, the Facilities and the Plant. <br /> <br />Section 5.08 <br /> <br />Connections to the Pipeline. <br /> <br />The City shall have the right to permit and construct connections, at no expense to Panda, to the Pipeline to <br />supply Raw Water for other users. Notwithstanding any other provision herein to the contrary, Panda shall have <br />priority over the use and transportation of the Raw Water. The City shall not enter into any agreement or construct <br />any connection which would have an immediate or long-term consequence of diminishing the amount of Raw Water <br />transported to the Plant by the Pipeline. Any agreements entered into by the City with any Person other than Panda <br />shall contain language acknowledging that Panda has priority over the use and transportation of the amount of Raw <br />Water provided for herein. <br /> <br />.4- <br /> <br />G:\A TTORNEY\Scott\Current Work\water agr. final.doc4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.