My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Hist Pres Com Min 03-14-06
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2006
>
04 April
>
2006 04-10
>
04-B Hist Pres Com Min 03-14-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2006 10:36:49 AM
Creation date
4/5/2006 10:36:48 AM
Metadata
Fields
Template:
AGENDA
Item Number
04-B
AGENDA - Type
MINUTES
Description
Historic Preservation Commission Mtg Min 03-14-06
AGENDA - Date
4/10/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />At the September 27, 2004 meeting the COA for the construction of the <br />building was issued. The certificates expire in a year. The Army was <br />ready to start to work and a new application was received in January, <br />2006. A renewal certificate was issued on January 18, 2006, for the <br />building work to proceed. The concern of the Commission was that <br />some of the building plans have changed from what was originally <br />approved. <br /> <br />The original rendition was basically just a rendition showing the <br />Commission what the front was to look like. Rodney Flippen stated <br />that they were initially going to brick only the front of the building. The <br />Commission was concerned about the sides of the building. While he <br />was out on surgery leave, he came back to find that split block had <br />been approved, but apparently it was not presented to the Commission. <br />The other change was the appearance of the front to keep it from <br />looking like a "cracker box." Harrison, Walker and Harper helped with <br />the design early on, a couple of years ago. KBI became the general <br />contractor with no profit for doing the project-it was done at cost for <br />benefit of the community project. The storefront was an additional <br />$10,000, but they are happy with it and hope that it will enhance the <br />appearance of the building. Mr. Flippen was concerned about how the <br />facade would be affected when they went from the brick to split block. <br /> <br />Arvin Starrett said that it was originally approved with only the south <br />wall not being masonry. Chairman Starrett stated that with regard to <br />some of the details on the facade, if this was designed to be a brick <br />building, and he wondered how these details would come out using the <br />new materials. <br /> <br />Bobby Smallwood said that it is his understanding that all four of the <br />walls would be block, and said that the building can still look like the <br />picture using block. He thinks they are using 4" thick to do the recess. <br /> <br />Paul Denney said that on the CVS building, the wall is a load bearing <br />wall. There is no question that it is cheaper to build this type of wall <br />than a concrete block backed up with brick veneer if it's load bearing. <br />Mr. Denney asked why they decided to use 8" block rather than block <br />panel and then brick veneer. Since the Salvation Army project doesn't <br />have a load bearing wall situation like CVS, he said he was kind of <br />surprised that the other method wasn't more economical. Rodney <br />Flippen said that Bryan Bethea with KBI was to be present at the <br />meeting to answer questions, but he is on vacation, so he couldn't <br />answer that question. <br /> <br />Paul Denney said that most of the time, that block will perform well, but <br />
The URL can be used to link to this page
Your browser does not support the video tag.