Laserfiche WebLink
<br />Table I <br /> <br />Points of Delivery Individual Maximum Diversion Rate (2ph) <br /> Phase 1 Phase 2 <br />I I 04,400 TBD <br />3A & 3B* 240,000 (combined) TBD <br />4 54,900 TBD <br />5 TBD TBD <br />6 TBD TBD <br />7 58,800 TBD <br />8 TBD TBD <br /> <br />* Points of Dclivery 3A & 38 arc the only Points of Delivcry that are not locatcd on Paris' Distribution System at the <br />currcnt time. The Parties acknowledgc that LCWSD may, in the futurc, elect to takc all the water authorized by this <br />Agrcement through Points of Dclivery 3A, 38, and additional points of delivery constructed pursuant to '\l 2.3(i) at the <br />City's water treatment plant or low-prcssurc transmission facilities. If this occurs, LCWSD may, subject to thc <br />requircmcnts of 2.3(i), including the requircmcnt to construct adequate storage to buffcr impacts on Paris' system, takc <br />from Paris' systcm, including such storage constructcd before the Point of Delivcry, up to, but not more than, 395,820 <br />gph in Phasc I and 499,980 gph in Phasc 2. <br /> <br />For purposes of determining the Total Maximum Diversion Rate, metered water <br />deliveries at Points of Delivery Nos. 4, 5, 6, 7 and 8 located on the Water Distribution <br />System shall incorporate an adjustment for the lesser of 10% or the actual percentage of <br />water lost and unaccounted for in the Water Distribution System as determined in Paris' <br />most recent study of lost and unaccounted for water. Metered water deliveries at Point of <br />Delivery No.1 located on the Water Distribution System shall incorporate an adjustment <br />of 9% for lost and unaccounted for water. Individual Maximum Diversion Rates at <br />Points of Delivery Nos. 3A and 38 located on the Water Treatment System and future <br />Points of Delivery on the low-pressure transmission facilities described in 2.3.i do not <br />incorporate adjustments for water lost and unaccounted in the Water Treatment System. <br />Individual Maximum Diversion rates for Points of Delivery 6, 7, and 8 during Phase 1 <br />and all Points of Delivery during Phase 2 will be established by a written agreement <br />between Paris and LCWSD acting through their City Manager and General Manager <br />respectively. In the future, the Individual Maximum Diversion Rates or initial Points of <br />Delivery may be changed or new Points of Delivery may be added by written agreement <br />between Paris and LCWSD acting through their City Manager and General Manager <br />respectively. Individual Maximum Diversion Rates for future Points of Delivery located <br />on the Water Distribution System will incorporate adjustments for the lesser of 10% or <br />the actual percentage of water lost and unaccounted in the Water Distribution System. <br />Individual Maximum Diversion Rates for future Points of Delivery located on the Water <br />Treatment System will not incorporate adjustments for water lost and unaccounted in the <br />Water Distribution System. The Total Maximum Diversion Rate of 6,597 gallons per <br />minute or 395,820 gallons per hour in Phase 1, adjusted for water lost and unaccounted <br />for and 8,333 gallons per minute or 499,980 gallons per hour in Phase 2, adjusted for <br />water lost and unaccounted for, shall not be exceeded. LCWSD shall bear all costs of <br />connecting to Paris' system at each Point of Delivery. LCWSD agrees that each new <br />connection to Paris' facilities shall be approved by the City and that LCWSD's request <br />for such approvals shall be accompanied by an engineering report and plans prepared by <br /> <br />8 Paris/LCWSD Wholesale Trcatcd Watcr Contract <br /> <br />roo-- <br />