My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-C City Street HMAC Overlay Program
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
08 August
>
2007 08-27
>
04-C City Street HMAC Overlay Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 9:41:52 AM
Creation date
8/23/2007 9:41:50 AM
Metadata
Fields
Template:
AGENDA
Item Number
04-C
AGENDA - Type
BIDS
Description
Awarding bid & authorizing contract for the 2007 City Street HMAC Overlay Program
AGENDA - Date
8/27/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONTRACTOR'S RESPONSIBILITIES: <br /> <br />Contractor shall be responsible for and shall have included in his unit price bid for <br />the appropriate item: <br /> <br />a. Equipment required to accomplish the project in a workman-like manner. <br />All equipment shall be in good working order such that downtime is <br />minimized. <br /> <br />b. Properly trained personnel capable of performing assigned tasks. <br />c. Putting down the deposit for the fire hydrant meter. <br /> <br />d. Provide adequate number of personnel to provide a first class product. <br /> <br />e. Provide adequate number of dump trucks to remove salvaged asphalt <br />pavement (millings) and furnish HMAC to the paving operations, thereby <br />minimizing non-productive time. <br /> <br />f. CONTRACTOR shall deliver salvaged asphalt (millings) to the Public <br />Works Yard located at 655 West Center Street. The city will keep the <br />storage pile pushed-up such that the dump trucks will only be required to <br />dump at the designated location with a minimal amount of maneuvering. <br /> <br />g. CONTRACTOR and City shall work together to accomplish a first class <br />completed project. It is intended that the Owner's representative will <br />direct the work and the contractor work cooperatively to accomplish the <br />work as requested with compensation to the contractor in accordance with <br />the unit price bid for each particular item. <br /> <br />MATERIALS: <br />1. MILLING OPERATIONS <br /> <br />Milling operations shall be as specified in ITEM 354, TXOOT specifications. The <br />owner's representative shall direct the milling operations as to location, depth of <br />milling will be approximately two inches. Milling will be paid for at the unit bid <br />price. <br /> <br />2. HOT MIX ASPHALTIC CONCRETE PAVEMENT (HMAC) <br /> <br />HMAC shall be as specified in ITEM 340 TXOOT specifications. HMAC shall be <br />TYPE "0" Fine-Graded Surface Course. HMAC will be paid for at the unit bid <br />price. <br /> <br />3. TACK OIL <br /> <br />Tack oil applied shall be a SS-1 or other approved equal to be paid for at the unit <br />bid price. <br />
The URL can be used to link to this page
Your browser does not support the video tag.