My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-B Groundwater Monitoring Stillhouse Road Landfill
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
10 October
>
2007 10-08
>
09-B Groundwater Monitoring Stillhouse Road Landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 8:34:41 AM
Creation date
10/4/2007 8:34:39 AM
Metadata
Fields
Template:
AGENDA
Item Number
09-B
AGENDA - Type
RESOLUTION
Description
Contract with Weaver Boos Consultants-groundwater monitoring at Stillhouse Rd Landfill
AGENDA - Date
10/8/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Shawn Napier, P .E. <br />July 18, 2007 <br />Page 3 <br /> <br />Task 3 - Facility Well Inventory <br /> <br />WBC will conduct an inventory of existing facility monitor wells and piezometers as <br />required by the TCEQ. According to TCEQ files, there may be 26 facility wells on or <br />adjacent to the landfill. Based on WBC's review of the case files, there may be more wells <br />at the site. For all located facility wells, each well's coordinates, depth, water level, well <br />condition, and repair/plugging recommendations will be recorded. This task assumes the <br />City will provide a surveyor with a GPS unit to accompany WBC's inventory technician <br />for about two days and record well coordinates. The City's surveyor costs are not <br />included in this proposal. Consistent with previous City proposal requests, the City's <br />surveyor will invoice the City directly. <br /> <br />Task 4 - Groundwater Sampling and Analyses Events <br /> <br />To determine if groundwater contamination issues persist, two consecutive quarterly <br />groundwater.sampling.events wilL be completed in the five landfill monitoring. wells and <br />14 piezometers requested by the TCEQ in)998. WBC will provide an: experienced <br />sampler and all necessary' sampling equipm~nt to complete the field portion of this task. <br />Immediately prior to'purging and sampling, water levels and methane gas concentrations <br />will be measured in 19 wells and piezometers at the site. The piezometers will be purged <br />and sampled in accordance with standard practices and consistent with recent events. <br />Groundwater samples will be collected from monitoring wells MW-l, MW-2, MW-3, <br />MW-4 MW-5 and piezometers MW-4A MW-5A P-I P-2 P-3 P-4 P-5 P-6 P-9 P- <br />:>, """", <br /> <br />lOA, P-ll, P-12, P-13, and P-14. Samples collected each day will be shipped overnight to <br />Test America (formerly Severn Trent Laboratories in Austin and analyzed for the 47 <br />VOCs listed by the TCEQ in Chapter 330 and ammonia (consistent with past events and <br />the TCEQ directive). Test America will provide signed laboratory reports with associated <br />laboratory QAlQC data and the required TCEQ report forms. The estimated laboratory <br />cost includes the quality control analyses of one field blank, one trip blank, and one <br />duplicate sample. Fiel9- purging and sampling data will be recorded by WBC on individual <br />well data sheets and chain-of-custody forms. WBC estimates about three days will be <br />required to purge and sample the 19 wells and piezometers, package and ship the samples, <br />and complete the required documentation. Consistent with previous City proposal <br />requests, Test America laboratory will contract directly with the City of Paris for service <br />payment. This proposal includes the estimated City cost (at standard turnaround time <br />without WBC subcontractor markup) for the proposed analytical services. <br /> <br />Task 5 - Project Status Report <br /> <br />After receiving the analytical data from the two WBC sampling events, WBC will prepare <br />a project status report summarizing the project activities completed between January 1998 <br />and early 2008. The report will include the WBC and EMCON-collected information <br /> <br />Q..lcrrr OF PA.lI,/SI/'ROPOSALIGW PROPOSAL 07.Q7,DQC <br /> <br />o/ftUWfW fjJfX>.Y <&CnMdI.antY <br /> <br />-'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.