My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-B Groundwater Monitoring Stillhouse Road Landfill
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
10 October
>
2007 10-08
>
09-B Groundwater Monitoring Stillhouse Road Landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 8:34:41 AM
Creation date
10/4/2007 8:34:39 AM
Metadata
Fields
Template:
AGENDA
Item Number
09-B
AGENDA - Type
RESOLUTION
Description
Contract with Weaver Boos Consultants-groundwater monitoring at Stillhouse Rd Landfill
AGENDA - Date
10/8/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Shawn Napier, P.E. <br />July 18, 2007 <br />Page 5 <br /> <br />Additional Considerations <br /> <br />We have developed the preceding proj ect approach based on our understanding of <br />available infonnation. The following is a list of additional considerations for the City's <br />current and future consideration. <br /> <br />· As per previous City requests, the drilling, analytic laboratory, and land survey <br />contractors will contract directly with the City for service payment. The City <br />will be responsible for disposal of all soil and groundwater wastes generated by <br />the investigation activities. In addition, this proposal assumes no WBC costs <br />will be incurred in securing agreements or accessing neighboring properties. <br /> <br />· Additional WBC and drilling contractor costs may be incurred due to poor <br />access or impassible conditions. <br /> <br />Included in Attachment 2 are copies of a Proposal Acceptance Sheet, WEC General <br />Ternis arid Conditions, and- WBC annual fee schedule.; If this proposal isaccepta:ble,- <br />please return one signed copy of the Proposal Acceptance Sheet to our office~ We <br />appreciate the opportunity to berof service to the City of Paris. Please contact us with any <br />questions or concerns. <br /> <br />Sincerely, <br />Weaver Boos Consultants, LLC-Southwest <br /> <br />Robert S. Ferbend, P.G. <br />Senior Hydrogeologist <br /> <br />fW/~ <br /> <br />Jeffrey P. Young, P .E. <br />Principal <br /> <br />12M 4- 1-4- <br /> <br />Attachments: Attachment 1: <br /> <br />Attachment 2: <br /> <br />TCEQ Correspondence Dated January 21, 1998 <br />TCEQ Correspondence Dated March 2, 2001 <br />Proposal Acceptance Sheet <br />WBC General Tenns and Conditions <br />WEC Annual Fee Schedule <br /> <br />g,le/IT OF PARISIPIWPOSALIGW PROPOSAL 07-07.DOC <br /> <br />o/f(UW(Yt/ $()OJ/ q;t:PnMd.k~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.