My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-B Groundwater Monitoring Stillhouse Road Landfill
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
10 October
>
2007 10-08
>
09-B Groundwater Monitoring Stillhouse Road Landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2007 8:34:41 AM
Creation date
10/4/2007 8:34:39 AM
Metadata
Fields
Template:
AGENDA
Item Number
09-B
AGENDA - Type
RESOLUTION
Description
Contract with Weaver Boos Consultants-groundwater monitoring at Stillhouse Rd Landfill
AGENDA - Date
10/8/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Barry R. McBee, Chairman <br />R. B. "Ralph" Marquez, Commissioner <br />r'j John M. Baker, Commissioner <br />Dan Pearson, Executive Director <br /> <br /> <br />.:-. <br /> <br />TEXAS NATURAL RESOURCE CONSERVATION COMMISSION <br /> <br />Proteding Texas bV Redudng and Preventing Pollution <br /> <br />January 21, 1998 <br /> <br />. The Honorable Eric S. Clifford, Mayor <br />City ofparis <br />P.O. Box 1037 <br />Paris, Texas 75460 <br /> <br />RE: SoUd Waste - Lamar COlU1ty <br />City of Paris Stillhouse Rd. Landflll- MSW Permit No. 144 <br />Groundwater Investigation Report and Future Activities <br /> <br />Dear Mayor Clifford: <br /> <br />We have reviewed the report entitled Groundwater Investigation. City of Paris Stillhouse Road Landfill. <br />MSW Permit No. 144, dated September 1997. The document was submitted under a cover letter dated <br />October 6, 19.97, signed by Mr. A. Richard Smith, Senior Hydrogeologist, BMCON, Fort Worth, Texas. <br />Thank you for the report. <br /> <br />/'......\ <br />() <br /> <br />We are glad to read about improvements in ~nal cover and drainage, and are interested in the possibility <br />that the volatile organic compolU1ds (VOCs) detected may be related to landfill gas. Please implement the <br />recommendations made in the report for further activities at the site, with the following modifications: <br /> <br />Ensure that the methane"gas survey adequately covers the entire site. In addition to concentrating <br />on the southeast part of the site, please also focus on the area arolU1d piezometer P-l1, which has <br />shoM! the highest overall concentrations ofVOCs in groundwater samples taken during 1996. <br /> <br />· Install replacement piezometer P-10A., and the proposed new piezometers P-13 and P-14 by the <br />end of the first quarter of 1998. (Note; In Figure 18 of the report, the proposed piezometers were <br />designated .P-12 and P-13; P-12 already exists, therefore the new piezometers should be <br />designated P-13 and P-14.) . <br /> <br />As soon as the replacement piezometer and new piezometers are ready, sample all monitor wells <br />(MW-l; 2, 3, 4, 5) and piezometers (P-I, 2, 3, 4, 5, 6, 9, lOA, 11, 12, 13), and the leachate from <br />MW -4A. Analyze samples for VOCs and ammonia as proposed. . <br /> <br />· Continue semiannual monitoring of all wells and piezometers in which VOCs are detected during <br />the first event in 1998. After additional infonnation is obtained and further reconunendations are <br />made, the monitoring schedule may be revised. <br /> <br />I' . <br />() Continue leachate extraction from MW-4A <br /> <br />P.O. Box 13087 · Austfn, Texas 78711-3087 o. 512/239-1000 0 Internet a9dress: www.tnrcc.state.tx.us <br />printtd cn rtcyde~ raptr using 5o}'.b~d ink <br />
The URL can be used to link to this page
Your browser does not support the video tag.