Mike Dokell
<br />Cherry Companies
<br />Division Manager - Commercial, Interior, Residential Demolition
<br />• Dismantle entire tank terminal; Shell Oil, Dallas, Texas, 1995
<br />• Demolition of concrete foundations; Shell Oil, Houston, Texas 1995
<br />• Cleaning and dismantling of entire former refinery; Ashland Petroleum, Louisville, Kentucky, 1996
<br />Clzemical
<br />• Dismantle explosion damaged boiler; Exxon, Baytown, Texas, 1988
<br />• Dismantle two (2) boilers; Amoco, Chocolate Bayou, Texas, 1989
<br />• Dismantle entire chemical processing facility; Olin Chemical, Moundsville, West Virginia, 1990
<br />• Dismantle entire catalyst manufacturing facility; American Cyanamid, Ft.Worth,Texas, 1991
<br />• Demolition of research building; Exxon Research, Baytown, Texas, 1991
<br />• Dismantle VCM Unit; Occidental Chemical, Deer Park, Texas, 1991
<br />• Dismantle entire pesticide manufacturing facility; Rhone-Poulenc, Portland, Oregon, 1992
<br />• Demolition and clean-up of explosion damaged unit; Monsanto, Chocolate Bayou, Texas, 1992
<br />• Dismantle boiler tanks and miscellaneous equipment; PPG, Lake Charles, Louisiana, 1992
<br />~ Dismantle two (2) boilers inside powerhouse; PPG, New Martinsville, West Viriginia, 1993 „
<br />~ Dismantle tanks, piping and concrete; Ashland Chemical, Atlanta, Georgia, 1994
<br />~ Dismantle silos and equipment in phosphate unit; Agrico, Taft, Louisiana, 1994
<br />Pulp /Paper
<br />• Turn-around of electrostatic precipitator and process equipment; James River Paper, St. Francisville,
<br />Louisiana, 1988
<br />• Turn-around of boiler rebuild and miscellaneous equipment; Boise Cascade, Jackson, Alabama,
<br />1991
<br />• Refiner demolition; Riverwood International, Macon, Georgia, 1993
<br />• Demolition of hardwood washers; Georgia Pacific, Crossett, Arkansas, 1994
<br />• Demolition of press board production buildings; Masonite, Laurel, Mississippi, 1994
<br />~ Demolition of chip yard, Georgia Pacific, Monticello, Mississippi, 1996
<br />Primarv Metals
<br />• Demolition of gas holder, coke oven, battery by-products; Armco Steel, Hamilton, Ohio, 1989
<br />• Demolition of mill building, power plant and associated equipment and concrete at Superfund site
<br />of former lead and zinc smelter, Bunker Hill, Kellogg, Idaho, 1995
<br />• Demolition of Trinity Industries Facility, Houston, Texas, 2001
<br />• Dismantlement of three (3) electrostatic precipitators (Houston, Lighting & Power); Joy
<br />Manufacturing, Smithers Lake, Texas, 1989
<br />~ Dismantlement of two (2) electrostatic precipitators, Associated Electric Cooperative, New Madrid,
<br />Missouri, 1994
<br />` Demolition of power plant, DOE Oak Ridge National Laborator, Oak ridge, Tennessee, 1995
<br />
|