Laserfiche WebLink
<br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />II <br />3 <br />SI <br />. <br />. <br />. <br />3 <br />~ <br />. <br />3 <br />2 <br />:I <br />~ <br />~ <br />II <br />iI <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />RON HAVES, PE <br />Civil Engineer <br />Carter & Burgess, Inc. <br /> <br />Education <br />B.S., Civil Engineering, 1980 <br />Old Dominion University <br /> <br />Professional Registration <br />Registered Professional Engineer <br />1985, TX, 58807 <br /> <br />Organizations <br />American Society of Civil Engineers <br />Texas Natural Resource Conservation Commission <br /> <br />Professional Experience <br />Mr. Hayes has over 20 years of experience in civil engineering consulting with responsibility for planning and management of civil <br />and environmental engineering projects. Mr. Hayes has extensive experience in the preparation of plans, specifications and <br />estimates for water, wastewater, drainage and paving projects. <br /> <br />Relevant Project Experience <br /> <br />. Iron Bridge Pump Station Preliminary Design, TX; Project Engineer. Design of 22-mile, 108-inch diameter row water <br />transmission pipeline from lake Fork to lake Tawakoni. <br /> <br />. lake Fork Pipeline, Dallas, TX; Project Engineer. Project consisted of designing 26-miles of 108-inch diameter row water <br />transmission pipeline from lake Fork to lake T awakoni in east Texas. The design included preliminary hydraulic design of a <br />future lake Fork Pump Station, surge analysis for the transmission system, final plans and specifications for the pipeline, <br />permitting by the Corps of Engineers and TXDOT, conducting environmental and archeological surveys. Estimated construction <br />cost of $90,000,000. <br /> <br />. North Park Public Utility District, Harris County, TX; Project Engineer. Provided services to district including design and <br />preparation of technical specifications and contract documents for water, wastewater, paving and drainage improvements. <br />Services included construction oversight, progress payment review, state agency submittals and fund applications. <br /> <br />. Water and Wastewater Design for Unserved Areas, Dallas, TX; Project Engineer. Preliminary design and evaluation for 770 <br />unserved areas in Dallas. Design oversight for 19,200 linear feet of 8-inch wastewater main and 8,400 linear feet of 16-inch <br />water main under first unserved area construction contract. <br />