Laserfiche WebLink
<br />.' <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />3 <br />J <br />3 <br />I <br />I <br />2 <br />~ <br />! <br />J <br />J <br />J <br />J <br />J <br />11 <br />I <br />I <br />a <br />J <br />J <br />I <br />I <br />I <br />I <br />J <br /> <br />ALBERT PETRASEK, Jr, PhD, PE <br />Page 5 <br /> <br />. Comprehensive Developmental Moster Plan for the City of Orange, Texas; Project Manager/Engineer. Project included the <br />development of a Comprehensive Developmental Plan for this city of 23,000 in southeast Texas. Work performed included the <br />preparation of land use plans; master plans for water, wastewater, and municipal solid wastes; mopping of the city; and <br />development of the city GIS. <br /> <br />. Water and Wastewater Moster Plans for the City of Wilmer, Texas; Project Manager/Engineer. Project included the preparation <br />of both water and wastewater master plans for this city of 5,000. Planning period was through the year 2020. <br /> <br />. Utility Moster Planning, lone Star Army Ammunition Plant, Texorkana, Texas; Principal-in-Chorge; preparation of Facility Plan <br />for this industrial complex of over 40 square miles in north east Texas. Work included water distribution system, wastewater <br />collection system, the water treatment plant, the wastewater treatment plant, and performing a leak detection study on the <br />distribution system.. <br /> <br />. Bexar County Water System Planning, Son Antonio, Texas; Project Manager; development of Emergency Water Plan. Project <br />included developing the prototype emergency water plan for the Corps of Engineers for Son Antonio, Texas, which has 101 <br />water purveyors, 011 using the Edwards Aquifer as the source of supply. <br />