My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:36 PM
Creation date
4/24/2002 6:57:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />II <br />. <br />. <br />. <br />. <br />~ <br />. <br />. <br />3 <br />:J <br />11 <br />~ <br />. <br />. <br />a <br />I <br />I <br />. <br />. <br />II <br />I <br />I <br /> <br />ALBERT PETRASEK, ..Jr, PhD, PE <br />Page 4 <br /> <br />· Water Transmission line, Dallas, Texas; Project Engineer; Project included the design of 11 miles of 96-inch RCCP water <br />transmission line from the East Side Water Treatment Plant to Jim Miller Reservoir. Construction cost of $24,000,000. <br /> <br />· Water Transmission line, Dallas, Texas; Project Engineer; Project for Dallas Water Utilities included the design and construction <br />management of 17 miles of 84-inch transmission line from Jim Miller Pump Station to the Beltwood Reservoir. Construction <br />cost was $27,000,000. <br /> <br />· CISCO - Water Plant, Confidential Client, Australia, Project Manager; preparation of cost estimates and preliminary design of <br />a reverse osmosis water treatment facility for 0 DOD contractor. Project included the evaluation of existing well field as a <br />source of supply, and design of modifications to existing facilities to accommodate the new treatment processes. <br /> <br />. Design of Water Meter Stations for Dallas Water Utilities. Project includes the designs for three metering stations; Hackberry, <br />Elm Fork, and Jameson; that provide water metering service for DWU customer cities. Estimated project cost $4,500,000. <br /> <br />. Water Supply for the City of Mansfield. Design of well, ground storage, and booster pumps for the city. <br /> <br />· Safe Drinking Water Act Studies, lone Star Army Ammunition Plant and Red River Army Ammunition Depot Texarkana, Texas; <br />Project Manoger; Safe Drinking Water Act studies for the 3.0-MGD surface water treatment plant, including a study and <br />compliance evaluation. <br /> <br />· Water Storage and Pumping Facilities, Highland Park, Texas; Project Manager; design of l,500,OOO-gallon Gillon Avenue <br />ground storoge reservoir and booster pump station, including chlorine storage, handling, feeding and leak detection <br />equipment. Construction cost $1,500,000, <br /> <br />. Red Oak Water Treatment Plant, Red Oak, Texas; Project Manager; sanitary survey and preliminary design for Red Oak <br />Reservoir and preliminary design of 30-MGD treatment plant. Estimated construction costs of $45,000,000. <br /> <br />· Ozone/UV Disinfection Studies; Project Engineer; performed evaluation of combined ozone/UV disinfection os an alternative to <br />chlorination. The process was found to be significantly improved over the use of either process individually. <br /> <br />. Ozonation Studies; Project Engineer; performed evaluation of ozone contactor design. <br /> <br />. Project was performed for the U. S. EPA and included counter-current bubble diffusers, pocked columns, and continuous-flow <br />stirred tonk reactors. <br /> <br />· D/FW Airport Booster Pumps, D/FW International Airport, Texas; Project Manager; addition of 10-MGD booster pumps at <br />D/FWs East and West Pump Stations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.