Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />:I <br />S <br />. <br />. <br />. <br />11 <br />J <br />I <br />II <br />J <br />~ <br />3 <br />3 <br />I <br />. <br />.. <br />:I <br />II <br />. <br />. <br />. <br />. <br />. <br /> <br />ALBERT PETRASEK, Jr, PhD, PE <br />Page 3 <br /> <br />I <br />. Iron Bridge Row Water Pump Station Renovations, Dallas, Texas; Project Director for the renovation of the 240 MGD raw water <br />pump station. Project included the mechanical, electrical, instrumentation and controls, and structural components. Estimated <br />construction cost of $21 million. <br /> <br />. lake Fork Row Water Transmission line, Dallas, Texas; Project Director for the design and construction administration of 26 <br />miles of lOB-inch raw water transmission main. line will run from the lake Fork Pump Station, on the western shore of lake <br />Fork, to the Iron Bridge Pump Station on the western shore of lake Tawakoni. Estimated construction cost is $111 million. <br />The first section, which is 39,000 lF, is under construction for a contract amount of $27 million. <br /> <br />. lake Fork Pump Station, Dallas, Texas; Prepared design and cost estimates for the 216 MGD pump station with a connected <br />load of 24,000 HP. Prepared computer simulations of 26 miles of 108-inch line, 15 miles of 72-inch line, and 15 miles of <br />84-inch line with 14 pumping units in two different pump stations, Estimated construction cost of $27 million. <br /> <br />. Shorecrest 48-lnch Water Main, Dallas Water Utilities; Principal-In-charge for the design of 4,000 lF of 4B-inch water main <br />located on the north end of love field in Dallas, Tx. The main connected into the yard piping at the Bachman Water Treatment <br />Plant. The construction cost was $920,000. <br /> <br />. lake Tawakoni Transmission lines; Dallas, Texas; Project Director for the condition assessment, surge analysis, and surge <br />protection upgrading to 15 miles of 72-inch and 15 miles of 84-inch raw water transmission main. <br /> <br />. Iron Bridge Raw Water Pump Station No.2, Dallas, Texas; Project Director for the preliminary design of the 300 MGD raw <br />water pump station. Services provided included surveying, preparation of preliminary plans, cost estimates, and computer <br />simulation of system hydraulics. Estimated construction cost is $25 million. <br /> <br />. Water Treatment Plant, City of Donna, Texas; Principal-In-Charge for the design of a new 6 MGD surface water treatment plant. <br />Facility included raw water intake structures, reactor-clarifiers, filters, c1earwell storage, and high service pumping. Disinfection <br />for a is with chlorine dioxide followed by chlorination. Estimated construction costs of $5,300,000, <br /> <br />. long Range Water Supply Plan for Dallas Water Utilities; Principal-in-Charge, This project developed on implementation <br />program for the eastern portion of the City of Dallas system under drought conditions. The project had total estimated capitol <br />costs of $500,000,000 and included 0 new 100 MGD surface water treatment plant, improvements to on existing 176 MGD <br />pump station, the construction of a new 100 MGD pump station, and the construction of over 100 miles of 72 and 84-inch <br />transmission lines. \ <br /> <br />. Benbrook Water Treatment Plant Expansion, Texas; Project Manager; project included the expansion from 5.0 MGD to 11.0 <br />MGD. The treatment facilities included new rapid mixing basins, flocculation basins, clarifiers, and filters; additionally, <br />improvements were designed to the transfer pump station, high service pumps, and instrumentation and control system. <br />Construction cost of $2,500,000. <br />