My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:36 PM
Creation date
4/24/2002 6:57:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II <br />. <br />. <br />. <br />. <br />. <br />. <br />~ <br />A <br />a <br />II <br />. <br />IJ <br />IJ <br />1'-1 <br />PJ <br />p] <br />IJ <br />11 <br />m <br />PI <br />.1 <br />PJ <br />m <br />g <br />g <br />t1 <br />a <br />t1 <br />~ <br />lJ <br />~ <br /> <br />LIN LINDSEY <br />Inspector <br />Carter & Burgess, Inc. <br /> <br />Education <br />A.5., Farm & Ranch Management <br />Cooke County College <br /> <br />Professional Registration <br />National Institute of Certified Eng. Technicians <br />2000, VA <br /> <br />Professional Experience <br />Mr. Lindsey has over 35 years af extensive experience in construction inspection and quality control for 0 wide range of projects <br />including water and wastewater, utilities, roadways, airports, flood control and large mixed-use land developments, His experience <br />includes project field inspection supervision, contract administration and project coordination. He has also been responsible for <br />construction testing and monthly estimate verification. <br /> <br />Relevant Project Experience <br /> <br />. Cedar Crest Water Pump Station, Dallas, TX; Construction Observer. Inspection of a booster pump station with ultimate <br />pumping capacity of 130 MGD, serving two different pressure planes, and yord piping ranging up to 96 inches in diameter. <br /> <br />. Circle T Ranch Ground Storage Tank/Pump Station and Waterline, Westlake, TX; Senior Construction Inspector. Provided <br />inspection ond construction administration for 10 miles of 16- and 20-inch water pipeline, pump station, and ground storage <br />tank. <br /> <br />. Lake Fork Pump Station, Dallas, TX; Senior Construction Inspector. Providing oversight and supervision of inspection teams for <br />Segment 1, 0 1 O-mile section of 108-inch RCCP water transmission line. <br /> <br />. Lake Palestine Pipeline ROW, Dallas, TX; Project Coordinator. Coordinated the obtaining of rights-of entry for 42 miles of 8411 <br />water pipeline. <br /> <br />. Los Colinas Construction Management Services, Los Colinas, TX; Construction Observer. Provided inspection services for <br />construction of utilities including water, sewer, storm sewer, private utilities, grading, drainage and paving for 1.5 miles of Las <br />Colinas Boulevard and Colwell Boulevard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.