My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-055-RES ACCEPT PROPOSAL OF CARTER & BURGESS FOR PROFESSIONAL ENGINEERING SERVICES TO WATER LOST AND UNACCOUNTED FOR STUDY IN CITY'S WATER AND ACCOUNTING AND OPERATING SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:36 PM
Creation date
4/24/2002 6:57:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LlN LINDSEY <br />Page 2 <br /> <br />I <br />· Vista Ridge Development, lewisville, TX; Construction Observer. Provided construction management including contractor <br />oversight, payment requests, contractor meetings, agency coordination with TxDOT, city and others, and inspection of <br />infrastructure for 0 2,OOO-acre mixed-use development, including 25 miles of water lines, 35 miles of sewer lines, dry utilities, <br />roadways and bridges, and approximately 2 miles of levees and flood control channel. <br /> <br />· Vista Ridge Water 8. Sewer Master Plan 8. Design, lewisville, TX; Construction Observer. Inspection of a 20-MGD sewage lift <br />station with 3S-foot deep wet/dry pit, 2.5 miles of force main and 8 miles of 18" to 36" gravity sewer, and an 8S0-cis storm <br />water pump station and intake structure. <br /> <br />· Weatherford Water Purificotion Plant Improvements, Weatherford, TX; Senior Construction Inspector. Provided oversight of <br />construction inspection and administration for expanding and renovating the treatment works, lagoons, and force main. <br /> <br />· Euless Water Treatment Plant, Euless, TX; Construction Observer. Inspection of 011 plant facilities including yard piping. <br /> <br />· Mabelvale Booster Pump Station, little Rock, AR; Senior Inspector. Inspected construction of water storage reservoir and pump <br />station for city of little Rock, Coordinated with City stoff. <br /> <br />· Mabelvale Water System, England, AR; Senior Inspector. Inspected water system, including laying of 6" and 8" water lines and <br />construction of 60,000 gallon storage tank. Responsible for oversight of 011 traffic control. <br /> <br />· Park Ridge Boulevard and Utilities, Irving, TX; Senior Inspector. Provided inspection and contractor oversight for construction of <br />utilities including water, sewer, storm sewer, and private utilities grading, drainage and paving for 1.S miles of new 4-lane <br />divided thoroughfare. Responsible for oversight of 011 traffic control. Coordinated with city stoff. <br /> <br />· Richland Chamber~Fort Worth Transmission line, Navarro County, TX; Inspector. Inspected 0 10-mile section of 96" RCCP <br />water transmission line being constructed to convey row water to the City of Fort Worth. <br /> <br />· The Ballpark in Arlington, Arlington, TX; Construction Observer. Installation of site drainage, water and sewer facilities. <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.