My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-058-RES ACCEPT PROPOSAL OF HAYTER ENGINEERING SERVICES FOR WORK ON STILLHOUSE REALIGNMENT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-058-RES ACCEPT PROPOSAL OF HAYTER ENGINEERING SERVICES FOR WORK ON STILLHOUSE REALIGNMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:36 PM
Creation date
4/24/2002 7:27:53 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Id" HAYTER <br />R ENGINEERING, INC. <br /> <br />4445 S.E. LOOP 286 <br />PARIS, TEXAS 75460 <br />(903) 785-0303 <br />t=AX (903) 785-0308 <br /> <br />CONSULTANTS PLANNERS ENGINEERS <br /> <br />March 5, 2002 <br /> <br />Mr. Shawn Napier, P.E. <br />City Engineer <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75460 <br /> <br />Re: Stillhouse Road Alignment Studies <br /> <br />Dear Shawn: <br /> <br />This letter is to follow up on your request for a proposal for alignment studies on Stillhouse Road <br />between Clement Road and Loop 286. We appreciate your confidence in the qualifications of our <br />firm in selecting us for negotiations on this project. We look forward to working with you for a <br />successful conclusion. <br /> <br />As previously discussed, we have contacted Dallas Aerial Surveys and requested aerial photo <br />coverage of the project area, which will be suitable for enlargement to 1" = 20' scale together with I <br />foot contours. They anticipate that this work can be completed in less than 30 days. <br /> <br />Our recommended approach would be as follows: <br /> <br />1. Obtain good quality recent aerial photography of the project area. <br />2. Using the City's tax maps, Appraisal District information or similar, overlay the approximate <br />property boundaries onto the aerial photograph. <br />3. Determine classification of street designed from the City's master thoroughfare plan. <br />4, Review the City's drainage master plan and FEMA floodplain information to make a <br />preliminary determination as to size of drainage structure required. <br />5, Using design criteria from the City's subdivision ordinance, and other sources as appropriate, <br />provide three to five alternative alignments. <br />6. Prepare a general discussion of the advantage and disadvantages of each proposed alignment. <br />7. Develop preliminary cost projections for each alignment. <br />8. Develop an estimate of number of parcels that would need to be acquired for construction of <br />each alignment. <br />9. Coordination meetings with City staffas required to complete the project, and two meetings <br />with the City Council or other commissions as requested. <br /> <br />. <br />" <br />" <br /> <br />Our fee for the above services would be $8,500 which includes the aerial photography, and we would <br />estimate about 60 days would be required from the time the aerial photography is received. <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.