Laserfiche WebLink
B. Do not store or burn materials on site. <br />3.4 Schedules <br />A. Demolition shall be carried out in such a manner as to protect any adjacent facilities, <br />operations, and personnel as much as possible. <br />4. ASBESTOS <br />4.1 Survey <br />A. Asbestos inspection records indicate an asbestos content within floor, wall, ceiling and <br />roof components. In their current condition, all building materials are classified by the <br />EPA NESHAP 40 CFR 61.141 as regulated asbestos-containing materials (RACM). <br />B. CONTRACTOR shall obtain from CITY copy of the inspection records and maintain <br />such at the job site throughout project duration. <br />4.2 Permitting/Profiling <br />A. Notices under the National Emissions Standards for Hazardous Air Pollutants <br />(NESHAP) and Texas Department of State Health Services (TDSHS) regulations <br />shall be filed by CONTRACTOR in a timely manner as required for the demolition <br />to start as directed by CITY. CONTRACTOR shall not be responsible for <br />notification fees in their bid. CONTRACTOR shall be responsible for obtaining <br />and filing all additional permits and notices where required by local ordinances. <br />B. CONTRACTOR shall profile waste materials according to landfill requirements. <br />4.3 Regulatory Compliance <br />A. CONTRACTOR shall give all notices and comply with all applicable laws, ordinances, <br />rules, regulations and lawful orders of any public authority bearing on the safety of <br />persons or propei-ty or their protection from damage, asbestos exposure, injury or loss. <br />These rules and regulations include, but are not limited to: <br />• EPA's National Emissions Standards for Hazardous Air Pollutants <br />(NESHAPS) 40 CFR Part 61, Sub-parts A and M <br />• Texas Department of State Health Services concerning Texas Asbestos Health <br />Protection Act <br />• OSHA's final Asbestos Rules, for the construction industry, found at 29 CFR <br />Section 1926.1101, and following; and where applicable, for general industry, <br />found at 29 CFR 1910.1001 and following. <br />B. CONTRACTOR shall erect and maintain, as 1•equired by existing conditions and <br />progress of the work, al] reasonable safeguards for safety and protection, including <br />22 <br />w Ol)O1"" <br />_ . . . _ . . T. . . . <br />