My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2008
>
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 1:04:11 PM
Creation date
10/2/2008 3:14:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2008-078-RES
Doc Type
Resolution
CITY CLERK - Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Proper coordination for the shut-off of utility services and control measures for dust <br />and noise must occur prior to commencement of any demolition work. <br />3 EXECUTION <br />3.1 Preparation <br />A. Verify termination of utilities prior to commencing demolition activities on any <br />structure. <br />B. Coardinate maintenance of power, water, or other utilities necessary for any <br />adjacent building operations. <br />3.2 Demolition <br />A. Perform demolition in a manner to prevent injury or damage to persons, property, <br />and adjacent roadways and structures and take care not to weaken or otherwise <br />damage structural integrity of any work to remain. <br />B. Sprinkle debris with water to lay dust daily, but not to the extent of creating <br />flooding. <br />C. Remove designated structures in their entirety to the slab, and remove the slab if the <br />bid for the same is awarded. <br />D. Fill any voids or ruts caused by CONTRACTOR in the act of performing the Work <br />with soil and evenly compact to density of adjacent soil. <br />E. Salvage, protect, and relocate any structures or materials designated for <br />preservation by Owner. <br />F. Overall safety and adverse impact to the neighborhood shall be considered a <br />priority. CONTRACTOR shall provide demolition within hours which are <br />reasonable to the conditions of the neighborhood. <br />G. CONTRACTOR shall not leave the work site when portions of a structure or other <br />items are in a dangerous condition. Such conditions may require posting a guard <br />or continuing the demolition until the condition is relieved. <br />H. Mature and protected trees found on a property shall be protected. <br />CONTRACTOR shall work around the tree carefully to prevent damage to the tree <br />and its root system. Sapling trees and sprouts may be removed only if they are <br />found in a path needed for access to the structures. <br />3.3 Adjustment and Cleaning <br />A. Remove debris on a daily basis. <br />21 <br />» aoo1s4 <br />. . . _ . . . . . _ . T . _ . . . . _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.