My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2008
>
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 1:04:11 PM
Creation date
10/2/2008 3:14:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2008-078-RES
Doc Type
Resolution
CITY CLERK - Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. File and obtain local and state demolition permits and notices. <br />2.3 Examination <br />A. CONTRACTOR shall survey the existing conditions prior to beginning on-site <br />demolition operations. <br />B. Verify that existing utilities to be removed have been disconnected and capped. <br />C. If unanticipated mechanical, electrical, or structural elements that conflict with the <br />intended function or design of the site are encountered, investigate and measure the <br />nature and extent of the conflict. <br />2.4 Utility Services <br />A. Maintain existing utilities in service and protect against damage during demolition <br />operations. <br />B. Schedule any utility outages with the Director of Corrununity Development prior to <br />disconnection. <br />2.5 Protection <br />A. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of the <br />work area. Provision of safety includes use of appropriate barricades, traffic <br />control, control of the use of equipment near traffic or pedestrians, and provision of <br />other controls and warnings as needed or as specified herein. <br />B. CONTR.ACTOR shall continuously maintain adequate protection of all adjacent <br />construction against damage or loss from the operations performed under this <br />section. CONTRACTOR shall make good any such damage, injury, or loss, <br />except such as may be directly due to the actions of the CITY or its agents or due to <br />causes beyond CONTRACTOR's control and not to his fault or negligence. <br />C. All demolition that involves the removal or disturbance of asbestos containing <br />materials shall be performed in accordance with all applicable State and Federal <br />codes and regulations. <br />D. Equipment and tools left on the property are the responsibility of CONTRACTOR. <br />CITY shall not be responsible for theft, damage, or adverse use of the equipment. <br />2.6 Sequencing/Scheduling <br />A. CONTRACTOR shall work with the CITY and the Director of Community <br />Development to sequence and schedule work as necessary to obtain substantial <br />completion in accordance with the project schedule. <br />20 <br />- OOU163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.