Laserfiche WebLink
C. All asbestos-containing waste materials shall be removed from the site at or before the <br />time of final acceptance and properly disposed of within ten (10) days of project <br />completion. <br />D. All construction debris removal from the site shall be considered asbestos <br />contaminated, No separation of waste materials shall be allowed without written <br />authorization. <br />E. All waste disposal vehicles andlor containers used to transport or store waste materials <br />shall be properly labeled in accordance with the requirements of 40 CFR 61.152. All <br />such vehicles and/or containers shall be poly lined to the extent needed to maintain a <br />leak tight status until waste is delivered to authorized landfill. <br />4.6 Air Monitoring <br />A. Air monitoring for asbestos exposure levels shall be performed daily throughout all <br />phases of demolition work which disturbs asbestos contaminated materials. <br />CONTRACTOR shal] insure that personnel responsible for collecting and <br />analyzing samples are properly licensed by the Texas Department of State Health <br />Services. Personnel having full NIOSH 582 training and/or Texas licensing shall <br />be on site to perform the required air monitoring. All samples shall be analyzed by <br />a Texas licensed asbestos laboratory. CONTRACTOR shall be responsible for <br />ensuring that all costs related to air monitoring are included in his bid. <br />B. Ambient air san-iples shall be collected on a daily basis during all work involving <br />the disturbance of asbestos-containing materials. Ambient samples shall be <br />collected at the following locations: <br />• Upwind <br />• Two Downwind Locations <br />• Track Hoe Cab Exterior <br />C. CONTR.ACTOR shall also collect personal samples on his workers in accordance <br />with OSHA regulations during all demolition operations. <br />D. CONTRACTOR shall supply CITY with copies of personal and ambient sample <br />analysis results within 24 hours of the date of analysis. CONTRACTOR shall post <br />the sample results for the workers to review on his notice board. <br />E. Daily logs shall record all sample locations and personnel affected by monitoring <br />results. <br />4.7 Licensing/Submittals <br />A. CONTRACTOR is considered exempt from the state asbestos licensing <br />requirements of the Texas Asbestos Health Protection Act. All supervisors and <br />workers involved with the project shall be EPA accredited and shall have current <br />24 <br />- u0016? <br />