My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2008
>
2008-078-RES AWARDING THE CONTRACT FOR THE DEMOLITION AND DISPOSAL OF THE 18 REMAINING BUILDINGS AT THE CASA BONITA APARTMENT COMPLEX LOCATED AT 7TH STREET NW AND HENDERSON STREET IN THE CITY OF PARIS TO INTERCON CONSTRUCTION COMPANY, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 1:04:11 PM
Creation date
10/2/2008 3:14:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2008-078-RES
Doc Type
Resolution
CITY CLERK - Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. All asbestos-containing waste materials shall be removed from the site at or before the <br />time of final acceptance and properly disposed of within ten (10) days of project <br />completion. <br />D. All construction debris removal from the site shall be considered asbestos <br />contaminated, No separation of waste materials shall be allowed without written <br />authorization. <br />E. All waste disposal vehicles andlor containers used to transport or store waste materials <br />shall be properly labeled in accordance with the requirements of 40 CFR 61.152. All <br />such vehicles and/or containers shall be poly lined to the extent needed to maintain a <br />leak tight status until waste is delivered to authorized landfill. <br />4.6 Air Monitoring <br />A. Air monitoring for asbestos exposure levels shall be performed daily throughout all <br />phases of demolition work which disturbs asbestos contaminated materials. <br />CONTRACTOR shal] insure that personnel responsible for collecting and <br />analyzing samples are properly licensed by the Texas Department of State Health <br />Services. Personnel having full NIOSH 582 training and/or Texas licensing shall <br />be on site to perform the required air monitoring. All samples shall be analyzed by <br />a Texas licensed asbestos laboratory. CONTRACTOR shall be responsible for <br />ensuring that all costs related to air monitoring are included in his bid. <br />B. Ambient air san-iples shall be collected on a daily basis during all work involving <br />the disturbance of asbestos-containing materials. Ambient samples shall be <br />collected at the following locations: <br />• Upwind <br />• Two Downwind Locations <br />• Track Hoe Cab Exterior <br />C. CONTR.ACTOR shall also collect personal samples on his workers in accordance <br />with OSHA regulations during all demolition operations. <br />D. CONTRACTOR shall supply CITY with copies of personal and ambient sample <br />analysis results within 24 hours of the date of analysis. CONTRACTOR shall post <br />the sample results for the workers to review on his notice board. <br />E. Daily logs shall record all sample locations and personnel affected by monitoring <br />results. <br />4.7 Licensing/Submittals <br />A. CONTRACTOR is considered exempt from the state asbestos licensing <br />requirements of the Texas Asbestos Health Protection Act. All supervisors and <br />workers involved with the project shall be EPA accredited and shall have current <br />24 <br />- u0016? <br />
The URL can be used to link to this page
Your browser does not support the video tag.