ENGINEERING/DESIGN INFORMATION-Phase 2 <br />A separate grant for engineering design will be offered, 10% of estimated engineering design <br />costs $15,000 expected to be due by March/ April 2012. <br />Total estimated design costs $150,000. <br />Note: Sponsor will be billed 30 days in advance. Sponsor should have the above figures <br />budgeted and encumbered by these dates. Sponsor will be apprised of all changes. <br />CONSTRUCTION INFORMATION- Phase 2 <br />Sponsor share of construction costs estimated to be $163,577. <br />Total construction costs estimated to be $1,635,776. This may change based on final design. <br />The Sponsor share will be due prior to construction advertising - estimated to be March/April <br />2012- this will depend on our federal funds that are available. Please be aware if federal funds <br />are not available at the time your project is ready to advertise, we will not advertise this project <br />until we have federal funds. This may possibly delay your project up to a year. <br />TxDOT will offer a 3rd grant for construction costs following completion of Commission <br />approval and bid opening. <br />Construction bids received and opened locally. TxDOT will execute construction contract. <br />- 000174 <br />