Laserfiche WebLink
3.7 Examine all studies, reports, sketches, Drawings, Specifications, proposals and other <br />documents presented by ENGINEER, obtain advice of an attorney, insurance counselor <br />and other consultants as OWNER deems appropriate for such examination and render in <br />writing decisions pertaining thereto within a reasonable time so as not to delay the <br />services of ENGINEER. <br />3.8 Furnish approvals and pertnits from all governmental authorities having jurisdiction over <br />the Project and such approvals and consents from others as may be necessary for <br />completion of the Project. <br />3.9 Provide such accounting, independent cost estimating and insurance counseling services <br />as may be required for the Project, such legal services as OWNER may require or <br />ENGINEER may reasonably request with regard to legal issues pertaining to the Project <br />including any that may be raised by CONTRACTOR(S), such auditing service as <br />OWNER may require to ascertain how or for what purpose any CONTRACTOR(S) are <br />complying with any law, rule, regulation, ordinance, code or order applicable to their <br />furnishing and performing the work. <br />3.10 If OWNER designates a person to represent OWNER at the site who is not ENGINEER or <br />ENGINEER' S agent or employee, the duties responsibilities and limitations of authority <br />of such other person and the affect thereof on the duties and responsibilities of <br />ENGINEER will be set forth in an exhibit that is to be identified, attached to and made a <br />part of this Agreement before such services begin. <br />3.11 If more than one prime contract is to be awarded for construction, materials, equipment <br />and services for the entire Project, designate a person or organization to have authority <br />and responsibility for coordinating the activities among the various prime contractors. <br />3.12 Furnish to ENGINEER data or estimated figures as to OWNER' S anticipated costs for <br />services to be provided by others for OWNER so that ENGINEER may make the <br />necessary findings to support opinions of probable Total Project Costs. <br />3.13 Attend the pre-bid conference (if any), bid opening, preconstruction conferences, <br />construction progress and other job related meetings and prefinal and final inspections. <br />3.14 Give prompt written notice to ENGINEER whenever OWNER observes ar otherwise <br />becomes aware of any development that affects the scope or timing of ENGINEER' S <br />services, or any defect or non-conformance in the work of any CONTRACTOR. <br />3.15 Furnish, or direct ENGINEER to provide, Additional Services as stipulated in paragraph <br />2.1 of this Agreement or other services as required. <br />9 <br />.000083 <br />