My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-044-RES ACCEPTING PROPOSAL OF MHS PLANNING & DESIGN FOR PROFESSIONAL SERVICES
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2001
>
2001-044-RES ACCEPTING PROPOSAL OF MHS PLANNING & DESIGN FOR PROFESSIONAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:02 PM
Creation date
8/7/2001 8:19:10 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2001
Doc Type
Resolution
CITY CLERK - Date
4/9/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br /> <br />Phase II Fee: $3,625.00 (one trip to Paris included) <br /> <br />Based on the local needs established through the Sports Complex Master <br />Plan, the city-wide plan will be revised. Not only will the revisions reflect <br />updated priorities, but other key elements believed to be beneficial to the <br />city's grant award chances will be made. Please understand that the plan <br />will be written to reflect the true needs in Paris, which is the basis of grant <br />award. <br /> <br />l'arks and Open Space Master Plan Revisions <br /> <br />l'hase II: <br /> <br />Phase I Fee: $ 9,250.00 (two trips to Paris included) <br /> <br />Using boundary plats, topography and flood maps provided by you, we will <br />prepare a base map showing the park acreage to be used for the complex. <br />We will then meet with you and representatives of the youth/adult sports <br />leagues to determine the types of facilities that should be included at the <br />complex. Once the contents of the park have been determined, we will <br />prepare a preliminary plan for the park. The plan will graphically show all <br />improvements including roads, parking and recreational facilities, and will <br />be drawn to scale on standard 24" x: 36" sheets. The preliminary plan will <br />be accompanied by a preliminary cost estimate for development. Once the <br />overall plan for development has been finished, we will determine which <br />portions of the plan should be included in the first phase. The park plan <br />will then be modified to accurately reflect Phase I development and a <br />preliminary budget will be prepared. The Phase I plan and budget will be <br />the basis of the grant application to Texas Parks and Wildlife. <br /> <br />[~ O. Box 7455 <br />Tyler, Texas 75711 <br />903-597 -6606 <br />903-597-0517 Fax <br /> <br />Sports Complex Master Plan <br /> <br />Phase 1 <br /> <br />It is with pleasure that I present this proposal to prepare a park master plan for the <br />Paris Sports Complex. This proposal is packaged to include all of the elements I believe <br />to be necessary for the City to proceed with the development of such a complex. <br /> <br />RE: Paris Sports Complex <br /> <br />Dear Terry: <br /> <br />Mr. Terry Townsend <br />Director of Public Works <br />POBox 9037 <br />Paris, TX 75460 <br /> <br />March 9, 2001 <br /> <br />MHS <br /> <br />I'I.A N NING & DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.