My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-081-RES ACCEPT PROPOSAL OF FREESE & NICHOLS FOR PROFESSIONAL ENGINEERING SERVICES FOR PRODUCTION STUDY OF WATER TREATMENT OF COP
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2002
>
2002-081-RES ACCEPT PROPOSAL OF FREESE & NICHOLS FOR PROFESSIONAL ENGINEERING SERVICES FOR PRODUCTION STUDY OF WATER TREATMENT OF COP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:43 PM
Creation date
6/4/2002 9:02:22 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Resolution
CITY CLERK - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Plant Production <br /> <br />Water Treatment <br /> <br />CAPACIlY ANALYSIS <br /> <br />Mr. Romack has more than 13 years experience serving as project manager, project <br />engineer and design engineer for numerous municipal and federal water and <br />wastewater treatment projects. <br /> <br />RANDAL D. ROMACK, P.E. <br /> <br />REPRESENTATIVE WATER TREATMENT PROJECTS INCLUDE: <br /> <br />. City of Fort Worth, Texas, North Holly Water Treatment Plant <br />Improvements Phase 1 - Task manager and technical advisor for the North <br />Holly Water Treatment Plant Improvements, Phase 1, that includes tube <br />settlers in 3 sedimentation basins, new filter gallery with 10 filters, rapid <br />mix/splitter box, backwash clarifier, and chemical feed improvements. <br /> <br /> <br />, <br /> <br />.......,t ~+ <br />--~-- <br /> <br />. City of Fort Worth, Texas, Rolling Hills Water Treatment Plant - Project <br />manager for the Rolling Hills Water Treabnent Plant (200 mgd) chemical <br />feed and rapid mix/splitter box project. The project included 90-ton <br />chlorine rail car facilities, new chlorine and ammonia facilities and a dual <br />train, 200-mgd, rapid/mix and splitter box. <br /> <br />City of Denton, Texas, New Water Treatment Plant - Task manager and <br />technical advisor for a new 20 mgd water treatment plant. Plant <br />components include ozonation, mixing, flocculation, sedimentation, filters, <br />clearwells, high service pumping and administration building. <br /> <br />. <br /> <br />. City of ~ort Worth, Texas, Renovations for the North and South Holly <br />Water Treatment Plants - As project manager, designed $4 million <br />renovations that replace chlorine and ammonia storage and feed facilities <br />with gas scrubbers and safety features that meet 1994 UFC at the North <br />and South Holly water treatment plants. <br /> <br />Greenbelt Municipal and Industrial Water Authority, Water Treatment Plant <br />and Childress Reservoir Project - Project manager for water treatment plant <br />and Childress Reservoir project that includes complete renovation of the <br />filters, chemical feed facilities and ground storage reservoirs. Design will. be <br /> <br />. <br /> <br /> <br />[!,"\\I v'-':' e!dCf!r:oi P,:._'.::r}/t'_ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.