Laserfiche WebLink
<br />- <br /> <br />complete by January 2002 and construction scheduled to be complete in <br />January 2003. <br /> <br />Plant Production <br /> <br />Treatment <br /> <br />Water <br /> <br />City of Vernon, Texas, Water System Improvements - Project manager for <br />the final design of groundwater nitrate removal system and other water <br />system improvements. This project included the design of a new ion <br />exchange water treatment plant, new building to house the ion exchange <br />system, and new valve and flow control vaults. <br /> <br />. <br /> <br />. City of Odessa, Texas, Demolition and Construction of Clearwells - Project <br />manager for demolition of two c1earwells and construction of a new 6 MG <br />Type III, pre-cast, prestressed concrete c1earwell. <br /> <br />. City of Snyder, Texas, Water Treabnent Plant Evaluation, Expansion and <br />Renovation - Project manager for water treabnent plant evaluation and <br />preliminary design of 6 mgd expansion/renovation. <br /> <br />. Brown County Water and Improvement District #1, Water Treatment Plant <br />Improvements - Assistant project manager for water treatment plant <br />improvements. Designed renovations to filters, underdrains and disinfection <br />application points. <br /> <br />Completed a water treatment <br /> <br />. Sabine River Authority, Treatability Study <br />plant treatability study. <br /> <br />City of Fort Worth, Texas, Safe Drinking Water Act Compliance Evaluation <br />- Performed Safe Drinking Water Act compliance evaluation. Conducted <br />tracer studies or calculated CT evaluations. <br /> <br />. <br /> <br />. City of Borger, Texas, Safe Drinking Water Act Compliance Evaluation <br />Performed Safe Drinking Water Act compliance evaluation. Conducted <br />tracer studies or calculated CT evaluations. <br /> <br />. City of Snyder, Texas, Safe Drinking Water Act Compliance Evaluation <br />Performed Safe Drinking Water Act compliance evaluation. Conducted <br />tracer studies or calculated CT evaluations. <br /> <br />9 <br />5 <br /> <br />YEARS OF EXPERIENCE <br /> <br />FNI <br />Other <br /> <br />With <br />With <br /> <br />rms <br /> <br />EDUCATION <br />MS, Environmental Engineering <br />University of Illinois <br />BS, Civil Engineering <br />University of Illinois <br /> <br />F <br /> <br />PROFESSIONAL TRAINING <br />Completed Composite Correction <br />Program (CCP) certification training, <br />USEPA Region 6, 1993 <br />OSHA Certification, Hazardous <br />Operations and Emergency <br />Response Training, July-92 <br /> <br />PROFESSIONAL EXPERIENCE <br />2000 - Present: Freese and Nichols <br />Water/Wastewater Discipline leader <br />999 - 2000: Other Firm <br />992 - 1999: Freese and Nichols <br />Environmental Engineer <br />988 - 1991 US Geological Survey <br />Civil Engineer <br /> <br />No. 8155 <br /> <br />REGISTRATION <br /> <br />Texas P.E <br /> <br />Waste <br /> <br />. City of Breckenridge, Texas, Safe Drinking Water Act Compliance <br /> <br /> <br />I! <br /> <br />API <br />