Laserfiche WebLink
<br />5. The contractor falsifies documents. <br /> <br />6. The contractor fails to submit timely or complete invoices. <br /> <br />7. The contractor fails to maintain current insurance coverage, or is <br />otherwise impaired in his ability to perform his responsibilities. <br /> <br />8. The contractor otherwise fails to comply with the requirements of <br />this policy. <br /> <br />B. In any instance in which the City Engineer determines a contractor should <br />be ordered to cease work, be disqualified from performing work by the day, <br />or be removed from the qualified contractors list, the City Engineer shall <br />notify the contractor of his action, specifying in said written notice his <br />reasons for his actions. Ifthe contractor remedies to the City Engineer's <br />satisfaction those matters which prompted the City Engineer's actions, the <br />City Engineer may, in his discretion, reinstate the contractor. Otherwise, <br />if the contractor fails to remedy such matters to the City Engineer's <br />satisfaction, the contractor may seek appeal of the City Engineer's decision <br />to City Council by filing a written request for appeal with the City Manager <br />within ten (10) days of receipt of the City Engineer's notification of his <br />action. Failure to timely appeal the City Engineer's action shall preclude <br />any further appeal for the contractor. Any contractor removed from the list <br />of qualified contractors shall remain removed from said list for a minimum <br />of one (1) year from the date of notification of his disqualification. <br />Thereafter, the contractor may apply to the City Engineer for reinstatement <br />on the list of qualified contractors and if his request for reinstatement is <br />denied, he may seek appeal of that decision in the same manner as set out <br />herein for the appeal of his original disqualification. <br /> <br />Section 8. Reportinl! to Citv Council. <br /> <br />The City Engineer shall, on a quarterly basis, prepare a summary report for <br />presentation as an agenda item on a regular or special City Council meeting. Said <br />report shall summarize all of the work by the day projects performed during the <br />immediately preceding quarter. Such report shall as a minimum include a brief <br />description of the project, the status of the project, the contractor performing the <br />project, the cost incurred to date, both for materials and work, and any other <br />comments or information the City Engineer or the City Council deem appropriate. <br /> <br />Section 9. Departures from Policy. <br /> <br />A departure from this policy is permissible only upon specific approval for said <br />departure by official action of the City Council. " <br />