My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-171-RES ESTABLISH COMPREHENSIVE POLICY FOR PERFORMANCE OF WORK PURSUANT TO SECTION 252.0225 OF TX LOCAL GOVERNMENT CODE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2003
>
2003-171-RES ESTABLISH COMPREHENSIVE POLICY FOR PERFORMANCE OF WORK PURSUANT TO SECTION 252.0225 OF TX LOCAL GOVERNMENT CODE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:28:25 PM
Creation date
12/29/2003 4:34:10 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2003
Doc Type
Resolution
CITY CLERK - Date
12/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. The contractor falsifies documents. <br /> <br />6. The contractor fails to submit timely or complete invoices. <br /> <br />7. The contractor fails to maintain current insurance coverage, or is <br />otherwise impaired in his ability to perform his responsibilities. <br /> <br />8. The contractor otherwise fails to comply with the requirements of <br />this policy. <br /> <br />B. In any instance in which the City Engineer determines a contractor should <br />be ordered to cease work, be disqualified from performing work by the day, <br />or be removed from the qualified contractors list, the City Engineer shall <br />notify the contractor of his action, specifying in said written notice his <br />reasons for his actions. Ifthe contractor remedies to the City Engineer's <br />satisfaction those matters which prompted the City Engineer's actions, the <br />City Engineer may, in his discretion, reinstate the contractor. Otherwise, <br />if the contractor fails to remedy such matters to the City Engineer's <br />satisfaction, the contractor may seek appeal of the City Engineer's decision <br />to City Council by filing a written request for appeal with the City Manager <br />within ten (10) days of receipt of the City Engineer's notification of his <br />action. Failure to timely appeal the City Engineer's action shall preclude <br />any further appeal for the contractor. Any contractor removed from the list <br />of qualified contractors shall remain removed from said list for a minimum <br />of one (1) year from the date of notification of his disqualification. <br />Thereafter, the contractor may apply to the City Engineer for reinstatement <br />on the list of qualified contractors and if his request for reinstatement is <br />denied, he may seek appeal of that decision in the same manner as set out <br />herein for the appeal of his original disqualification. <br /> <br />Section 8. Reportinl! to Citv Council. <br /> <br />The City Engineer shall, on a quarterly basis, prepare a summary report for <br />presentation as an agenda item on a regular or special City Council meeting. Said <br />report shall summarize all of the work by the day projects performed during the <br />immediately preceding quarter. Such report shall as a minimum include a brief <br />description of the project, the status of the project, the contractor performing the <br />project, the cost incurred to date, both for materials and work, and any other <br />comments or information the City Engineer or the City Council deem appropriate. <br /> <br />Section 9. Departures from Policy. <br /> <br />A departure from this policy is permissible only upon specific approval for said <br />departure by official action of the City Council. " <br />
The URL can be used to link to this page
Your browser does not support the video tag.