<br />20
<br />
<br />Life
<br />
<br />16
<br />
<br />10
<br />
<br /> Phase I
<br /> 7
<br />- - -
<br />$20,000 $20,000
<br />$7,000 $7,000
<br />$27,000 $27,0001 $27,000
<br />
<br />Sesaco Corporation
<br />CAPITAL IMPROVEMENTS
<br />SEED
<br />
<br />Blower system to remove seed from tanks
<br />Repair truck auger and tall elevator
<br />SEED RECEIVING TOTAL
<br />
<br />$35,000
<br />
<br />$9,000
<br />
<br />$35,000
<br />$9,000
<br />
<br />$54,000
<br />$35,000
<br />$18,000
<br />$5,000
<br />$20,000
<br />
<br />DRY ('I .. A"""'"
<br />
<br />Titan screening machine
<br />Oliver gravity separator
<br />Blower system for dry cleaning
<br />Installation by Sesaco
<br />Batch weighing system
<br />TOTAL DRY CLEANING
<br />
<br />$44,000
<br />
<br />$2,200
<br />$9,000
<br />
<br />$132,000
<br />
<br />$2,500
<br />$2,200
<br />$9,000
<br />
<br />DURING m.s.::
<br />LMC and Oliver relocation by Sesaco
<br />Electrical (Material & Labor)
<br />Blower system for temporary equipment
<br />TOTAL FOR EQUIPMENT
<br />
<br />-.....
<br />
<br />m
<br />X
<br />:I:
<br />
<br />-
<br />
<br />OJ
<br />=i
<br />OJ
<br />
<br />$219,300
<br />
<br />$11,200
<br />
<br />$11,200
<br />
<br />$219,300
<br />
<br />$2,000
<br />$10,000
<br />$28,000
<br />$96,000
<br />$25,000
<br />$5,000
<br />$45,600
<br />$3,500
<br />$600
<br />$2,500
<br />$1,100
<br />
<br />$13,700
<br />
<br />$219,300
<br />
<br />$2,000
<br />$10,000
<br />$28,000
<br />$96,000
<br />$25,000
<br />$5,000
<br />$45,600
<br />$3,500
<br />$600
<br />$2,500
<br />$1,100
<br />
<br />NEW BUILDING
<br />Electrial equipment removal by Sesaco
<br />Building demolition
<br />Foundation work
<br />Building construction cost(includes doors and air curtain
<br />Sprinkler system (use existing valve system)
<br />Gas & water piping
<br />Electric (Material & Labor for building and equipment wir
<br />Hot water system relocation
<br />Building permit
<br />Drawing cost
<br />Structural Eng. Cost
<br />BUILDING TOTAL