Laserfiche WebLink
<br />20 <br /> <br />Life <br /> <br />16 <br /> <br />10 <br /> <br /> Phase I <br /> 7 <br />- - - <br />$20,000 $20,000 <br />$7,000 $7,000 <br />$27,000 $27,0001 $27,000 <br /> <br />Sesaco Corporation <br />CAPITAL IMPROVEMENTS <br />SEED <br /> <br />Blower system to remove seed from tanks <br />Repair truck auger and tall elevator <br />SEED RECEIVING TOTAL <br /> <br />$35,000 <br /> <br />$9,000 <br /> <br />$35,000 <br />$9,000 <br /> <br />$54,000 <br />$35,000 <br />$18,000 <br />$5,000 <br />$20,000 <br /> <br />DRY ('I .. A"""'" <br /> <br />Titan screening machine <br />Oliver gravity separator <br />Blower system for dry cleaning <br />Installation by Sesaco <br />Batch weighing system <br />TOTAL DRY CLEANING <br /> <br />$44,000 <br /> <br />$2,200 <br />$9,000 <br /> <br />$132,000 <br /> <br />$2,500 <br />$2,200 <br />$9,000 <br /> <br />DURING m.s.:: <br />LMC and Oliver relocation by Sesaco <br />Electrical (Material & Labor) <br />Blower system for temporary equipment <br />TOTAL FOR EQUIPMENT <br /> <br />-..... <br /> <br />m <br />X <br />:I: <br /> <br />- <br /> <br />OJ <br />=i <br />OJ <br /> <br />$219,300 <br /> <br />$11,200 <br /> <br />$11,200 <br /> <br />$219,300 <br /> <br />$2,000 <br />$10,000 <br />$28,000 <br />$96,000 <br />$25,000 <br />$5,000 <br />$45,600 <br />$3,500 <br />$600 <br />$2,500 <br />$1,100 <br /> <br />$13,700 <br /> <br />$219,300 <br /> <br />$2,000 <br />$10,000 <br />$28,000 <br />$96,000 <br />$25,000 <br />$5,000 <br />$45,600 <br />$3,500 <br />$600 <br />$2,500 <br />$1,100 <br /> <br />NEW BUILDING <br />Electrial equipment removal by Sesaco <br />Building demolition <br />Foundation work <br />Building construction cost(includes doors and air curtain <br />Sprinkler system (use existing valve system) <br />Gas & water piping <br />Electric (Material & Labor for building and equipment wir <br />Hot water system relocation <br />Building permit <br />Drawing cost <br />Structural Eng. Cost <br />BUILDING TOTAL <br />