<br />20
<br />
<br />Life
<br />
<br />16
<br />
<br />10
<br />
<br />7
<br />
<br />Phase
<br />
<br />Sesaco Corporation
<br />CAPITAL IMPROVEMENTS
<br />
<br />$306,000
<br />$5,000
<br />
<br />$97,500
<br />$50,000
<br />$6,400
<br />$5,500
<br />
<br />$3,000
<br />$10,500
<br />
<br />$483,900
<br />
<br />$3,000
<br />$10,500
<br />
<br />$306,000
<br />$5,000
<br />$97,500
<br />$50,000
<br />$6,400
<br />$5,500
<br />
<br />$657,900
<br />
<br />$3,000
<br />$21,000
<br />$8,000
<br />$306,000
<br />$5,000
<br />$97,500
<br />$200,000
<br />$6,400
<br />$11,000
<br />
<br />WEL
<br />Receiving tank for wet line
<br />Pumps and hoses
<br />High speed hulling tank
<br />Dryer and dewatering table
<br />Catwalks
<br />Color sorters wI air dryer and air conditioning
<br />Packaging equipment wI metal detector
<br />Processing water meters wI display
<br />Blower systems for processing line (4 lines)
<br />TOTAL FOR WET PROCESSING
<br />
<br />$9,600
<br />$9,000
<br />
<br />BUILDING
<br />Remove equipment (by Sesaco)
<br />Replace sprinkler heads
<br />Total cost for existing building
<br />
<br />$6,000
<br />
<br />$20,000
<br />$9,000
<br />
<br />$6,000
<br />
<br />$20,000
<br />$9,000
<br />
<br />$18,600
<br />
<br />$6,000
<br />$10,000
<br />$15,000
<br />$20,000
<br />$9,000
<br />
<br />Al mNAL EQL
<br />Floor scales
<br />Lab equipment
<br />Fork lift
<br />Truck
<br />Stretch wrap machine
<br />TOTAL ADDITIONAL EQUIPMENT
<br />
<br />$219,300
<br />
<br />$311,000
<br />
<br />$194,400
<br />
<br />$95,700
<br />
<br />$35,000
<br />
<br />$820,400
<br />
<br />$60,000
<br />
<br />$1,128,500
<br />
<br />TOTAL (ESTIMATE)
<br />
|