Laserfiche WebLink
<br />Innovative approaches. . <br /> <br />.. <br /> <br />Fr.... and Nicholl <br /> <br />practical results <br /> <br />Timothy E. Campbell, P.E. <br />Electrical/SCADA <br /> <br />Years Experience: <br />Registrations: <br />Education: <br /> <br />12 <br />Professional Engineer, Texas 1996 (#81011) <br />B.S., Electrical Engineering, Texas A&M University, 1990 <br /> <br />Mr. Campbell is experienced in electrical design, project management, coordination <br />of mechanical and electrical disciplines, and vulnerability assessments and <br />emergency operations planning. He has a background in design of electrical and <br />instrumentation for water treatment plants, wastewater treatment plants, and water <br />distribution. He is also skilled in the electrical design of commercial and industrial <br />facilities, <br /> <br />Project Experience: <br /> <br />Water System Vulnerobility Assessments - Brown County WID # 1 and the <br />Cities of Abilene, Beaumont, Carrol/ton, Denton, Corpus Christi, Garland, Irving, <br />Midlothian, Piano, North Richland Hil/s, San Angelo and Temple, Texas. Reviewed <br />Water Utility Vulnerability Assessments related to power instrumentation and SCADA. <br />Provided not only recommendations for physical improvements, but also operational <br />and procedure changes. <br /> <br />Wastewater Treatment Plont - City of San Angelo, Texas - Design of plant <br />improvements including new headworks, odor control, digesters, sludge handling, <br />gravity belt thickener. The anaerobic digester gas was collected and used to feed the <br />boiler. <br /> <br />Wastewater Treatment Plant - City of Beaumont, Texas - Provided the electrical <br />design for the complete replacement of the electrical system for the plant. The <br />existing system was outdated and several portions were not operable due to the <br />extreme corrosion. A new looped primary feed system was installed that fed motor <br />control centers inside air-conditioned enclosures to protect them from the hydrogen <br />sulfide. The motor control centers and various electrical distribution equipment are <br />housed in temperature controlled, prefabricated, 304 stainless steel buildings to <br />protect the equipment from the corrosive environment. <br /> <br />Water Treatment Plant - City of Midland, Texas - Designed chemical feed <br />improvements, including chlorine storage and feed system. The $1.2 million <br />improvements included both chlorine and ammonia scrubber systems for the feed <br />and storage facilities. <br /> <br />Nitrote Treatment ond Other Woter System Improvements - City of Vernon, <br />Texas - Provided electrical and instrumentation design for the installation of the Ion <br />Exchange Treatment Plant, elevated storage tank, new well sites and chlorine <br />injection. This project included providing SCADA for the City, containing installation <br />of radio equipment for 34 well sites, and 12 sanitary sewer lift stations. <br /> <br />Woter Treotment Plant - City of Beaumont, Texas - Designed plant expansion <br />including new filters, pulsators, and chemical feed. Plant capacity was increased to <br />14 MGD. <br /> <br />Water System Vulnerability Assessment and Emergency Response Plan <br />