My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-050-RES AMENDMENT TO THE PROFESSIONAL SERVICES WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF THE UARCO BUILING TO NEW POLICE COURT AND JAIL FACILITY
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-050-RES AMENDMENT TO THE PROFESSIONAL SERVICES WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF THE UARCO BUILING TO NEW POLICE COURT AND JAIL FACILITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:24 PM
Creation date
4/27/2004 9:31:46 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
3/8/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Denny Boles, AlA <br />June 3, 2003 <br />Page 3 <br /> <br />b) Prepare drawings with information such as symbol legends, one-line <br />diagrams, equipment layouts on floor plans, device details, and <br />equipment layouts in room. <br />c) Prepare preliminary specifications of systems. <br /> <br />3. Construction Documents: <br />a) Finalize drawings with information such as symbol legends, one-line <br />diagrams, area floor plans with equipment layouts, device details, <br />and enlarged room plans and elevations with equipment layouts. <br />b) Finalize specifications of systems. <br /> <br />4. Bidding and Negotiation: <br />a) Make recommendations to the Client and Owner regarding the bids <br />or proposal received. <br />b) Answer questions referred by the Client and assist in the preparation <br />of addenda deemed necessary b the Client. <br /> <br />5. Construction Administration: <br />a) Review product data submittals. <br />b) Review shop drawings. <br />c) Answer questions during construction phase. <br />d) Provide one intermediate site observation with written report. <br />Additional site observations can be provided as outlined in the fee <br />proposal section. <br />e) Provide one final site observation upon construction completion <br />including punch with fmal observation or punch-list report. <br />Additional site observations can be provided as outlined in the fee <br />proposal section. <br /> <br />II. EXCLUSIONS: <br /> <br />The following services are excluded or subject to an additional fee: <br /> <br />A. TelecommunicationsNoice Switching System: Design, specification, <br />coordination, documentation, and commissioning of any <br />telecommunications/voice switching and messaging system(s) including but not <br />limited to private branch exchange (PBX), voice over internet protocol (VoIP), <br />and central office exchange (CENTREX). <br /> <br />.~'~. ._~_..- .p--...,-.._-';" <br />. -..-.... <br /> <br />1_- <br /> <br />M-E ENGINEERS. INC, <br />10055 W. 43RD AVENUE <br />WHEAT RIDGE. CO 80033 <br />PH: (303) 421-6655 . FAX: (303) 421-0331 <br /> <br />DENVER <br />COLORADO SPRINGS <br />LOS ANGELES <br />VAIL <br />LONDON <br />
The URL can be used to link to this page
Your browser does not support the video tag.