My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-050-RES AMENDMENT TO THE PROFESSIONAL SERVICES WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF THE UARCO BUILING TO NEW POLICE COURT AND JAIL FACILITY
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-050-RES AMENDMENT TO THE PROFESSIONAL SERVICES WITH BRINKLEY-SARGENT ARCHITECTS FOR CONVERSION OF THE UARCO BUILING TO NEW POLICE COURT AND JAIL FACILITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:24 PM
Creation date
4/27/2004 9:31:46 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
3/8/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Denny Boles <br />Paris Police and Courts <br />SE Comer of Clarksville Street/Collegiate Drive <br />Paris, Texas <br /> <br />Page 2 <br />June 4, 2003 <br /> <br />4. Orainaae Area Map and Storm Sewer Plans: CSM will prepare storm sewer <br />plans in accordance with City requirements. The design of area drains in <br />open space and amenity areas will be coordinated with the Landscape <br />Architect This proposal does not Include off-site storm drainage or on-site <br />detention. <br /> <br />5. PavinQ Plan: CSM will prepare a paving plan showing areas of pavement <br />including driveway approaches, sidewalks, and construction details. Paving, <br />sidewalk and stair (not attached to the building) section designs will be based <br />on recommendations provided by the Geotechnical Engineer. Plans will <br />indude parking striping, control joint and expansion joint layouts. <br /> <br />6. GradinQ Plan: CSM will prepare a grading plan showing proposed finished <br />floor, site and paving elevations. All necessary grading and spot elevations <br />will be induded. All special design detaifs and elevations will be referenced <br />by civil and detailed by others. <br /> <br />7. Erosion Control Plan/Stann Water Pollution Prevention Plan: CSM will <br />prepare an erosion control plan/storm water pollution prevention plan in <br />compliance with City and Federal (EPA) guidelines. <br /> <br />8. Civil Technical Specifications: Specifications for work performed by CSM will <br />be prepared in a format acceptable to the Architect <br /> <br />9. Perform backwater computations (HEC2) to size proposed box culvert for <br />new roadway crossing of Big Sandy Creek, Tributary No.4. Backwater <br />computations will also take into account proposed berm/screening wall <br />effects on FEMA Flood profile. Existing FEMA Flood model will need to be <br />acquired from FEMA. <br /> <br />10. Submit CLOMRlLOMR for said project to FEMA on behalf of clients. <br /> <br />B. Public Utility Coordination: <br /> <br />CSM will coordinate with public utility companies (electric, gas and telephon~), <br />with the assistance of the Architect and MEP consultant, regarding service for <br />the project and easement requirements. CSM will coordinate service verificationeletters, if required. <br /> <br />06/04/03 WED 12:34 [TX/RX NO 5971] <br />
The URL can be used to link to this page
Your browser does not support the video tag.