My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-005-PEDCR
City-of-Paris
>
City Clerk
>
PEDC
>
Resolutions
>
2003
>
2003-005-PEDCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:26 PM
Creation date
5/27/2004 10:53:08 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2003
Doc Type
Resolution
CITY CLERK - Date
3/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Paris Economic Development Corporation <br />March 14,2003 <br />P2003.068 <br /> <br />Paris Industrial Park <br />Paris, Texas <br />Page 3 <br /> <br />. <br /> <br />Paving and Drainage Plan and Profiles - will show topography, grading plan, streets, <br />drainage features, etc. (typically multiple sheets if street system is extensive). For <br />projects with short or no streets, a Grading and Drainage Plan (no profiles) will be <br />developed. <br />Channel Alignment and Details (when applicable). <br />Utility Site Plan - water and sewer utilities will be detailed, including locations of <br />manholes and valves. Primary features of electric, gas, and telephone lines will be <br />shown based on survey data and available information provided by utility <br />companies. <br />Site Details - Signage, fencing, pavement markings, etc. <br />Erosion Control Plan - will include appropriate EPA requirements. <br />Standard Details - these are used to provide details of construction of various <br />drainage and utility features. May typically include: TxDOT bridge and culvert <br />standards; and Standard Storm sewer, Paving, Water, and Sanitary Sewer standard <br />sheets. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />D. <br />E. <br /> <br />Conduct internal plan review by ACEI staff. <br />Respond to Client comments on Construction Plans. <br /> <br />TASK 4 - HYDRAULIC ANALYSIS AND DESIGN <br /> <br />Prepare the necessary planwork for the construction of a stormwater layout, possibly including a <br />stormwater detention facility in accordance with the criteria set forth by the City of Paris. Coordinate <br />with the City of Paris Engineering Department to obtain approval of design. <br /> <br />Fee ......................,..............................."""""""""""""""""""""""""""................ $ 48,000 <br /> <br />SUPPLEMENTAL SERVICES <br /> <br />TASK 5 - CONTRACT AND CONSTRUCTION ADMINISTRATION <br /> <br />This includes site observations, coordinating with contractors, bid administration, answering <br />requests for information (RFI's) and reviewing monthly pay requests. ACEI will coordinate with <br />design team members, City officials, owner and other parties as needed to keep the project moving <br />in a positive direction. <br /> <br />A. <br />B. <br />C. <br />D. <br /> <br />Provide random observation of water and sewer utilities construction. <br />Provide random observation of curb/gutter, paving, and drainage features. <br />Provide contract administration with Client and contractors. <br />Coordinate with contractor to provide "as-built" drawings. <br /> <br />Suggested Fee Estimate............................................................................................. $ 9,000 <br /> <br />Initial: <br />
The URL can be used to link to this page
Your browser does not support the video tag.