Laserfiche WebLink
<br />Paris Economic Development Corporation <br />March 14,2003 <br />P2003.068 <br /> <br />Paris Industrial Park <br />Paris, Texas <br />Page 3 <br /> <br />. <br /> <br />Paving and Drainage Plan and Profiles - will show topography, grading plan, streets, <br />drainage features, etc. (typically multiple sheets if street system is extensive). For <br />projects with short or no streets, a Grading and Drainage Plan (no profiles) will be <br />developed. <br />Channel Alignment and Details (when applicable). <br />Utility Site Plan - water and sewer utilities will be detailed, including locations of <br />manholes and valves. Primary features of electric, gas, and telephone lines will be <br />shown based on survey data and available information provided by utility <br />companies. <br />Site Details - Signage, fencing, pavement markings, etc. <br />Erosion Control Plan - will include appropriate EPA requirements. <br />Standard Details - these are used to provide details of construction of various <br />drainage and utility features. May typically include: TxDOT bridge and culvert <br />standards; and Standard Storm sewer, Paving, Water, and Sanitary Sewer standard <br />sheets. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />D. <br />E. <br /> <br />Conduct internal plan review by ACEI staff. <br />Respond to Client comments on Construction Plans. <br /> <br />TASK 4 - HYDRAULIC ANALYSIS AND DESIGN <br /> <br />Prepare the necessary planwork for the construction of a stormwater layout, possibly including a <br />stormwater detention facility in accordance with the criteria set forth by the City of Paris. Coordinate <br />with the City of Paris Engineering Department to obtain approval of design. <br /> <br />Fee ......................,..............................."""""""""""""""""""""""""""................ $ 48,000 <br /> <br />SUPPLEMENTAL SERVICES <br /> <br />TASK 5 - CONTRACT AND CONSTRUCTION ADMINISTRATION <br /> <br />This includes site observations, coordinating with contractors, bid administration, answering <br />requests for information (RFI's) and reviewing monthly pay requests. ACEI will coordinate with <br />design team members, City officials, owner and other parties as needed to keep the project moving <br />in a positive direction. <br /> <br />A. <br />B. <br />C. <br />D. <br /> <br />Provide random observation of water and sewer utilities construction. <br />Provide random observation of curb/gutter, paving, and drainage features. <br />Provide contract administration with Client and contractors. <br />Coordinate with contractor to provide "as-built" drawings. <br /> <br />Suggested Fee Estimate............................................................................................. $ 9,000 <br /> <br />Initial: <br />