My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 Planning & Zoning
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
03 March
>
2009-03-09
>
20 Planning & Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:48:53 AM
Creation date
3/9/2009 4:21:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
20
AGENDA - Type
MISCELLANEOUS
Description
20 Planning and Zoning
AGENDA - Date
3/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department of State Health Services <br />Demolition of Buildings <br />is tne ouiiaing a smgie rainuy <br />dwelling or an aparhnent complex >asa <br />or less units, and it ~~~ill continue to be residence or apartment complex of 4 YES units? N O <br />;xempt from all Regulated by the Texas Asbestos Health Protection Ac <br />e g u 1 a t i o n s, TAHPR) and/or National Emission Standards fo <br />xcept OSHA. Hazardous Air Pollutants (NESHAP). <br />An asbestos survey must be performed prior ti <br />emolition to identify the presence of Asbesto <br />Containing Building Material (ACB11). <br />>urvey must be pertorrne <br />n accordance wit <br />,AHPR by a DSH <br />Acensed Inspector. <br />YEs Is building N O Survey must be performe <br />a public building? yan inspector with cu: <br />rent training from a <br />PA approve <br />inspector's course. <br />is regulated ls regulated <br />asbestos contain- asbestos contain- <br />ing material (RACM) ing materia] (RACM) <br />above the ] 60 square feet, above the 160 square feet, <br />260 linear feet or 35 260 linear feet or 35 <br />cubic feet thresh- cubic feet thresh- <br />old? old? <br />YES N O YES N O <br />ubmit notification t Submit not~fication t Submit notification t Submit notification t <br />►SHS a minimum of 10 DSHS a minimum of 1 DSHS a minimum of 1 SHS a minimum of 1 <br />,orking days prior to th working days prior to th orking days prior to th -orking days prior to th <br />;moval of the RACM. Demolition start date. removal of the RACM. Demolition start date. <br />CM must <br />oved by a l <br />to demolition. <br />ACM must <br />moved prior <br />HAP train <br />,n must be on s <br />e removal. <br />00U210 <br />
The URL can be used to link to this page
Your browser does not support the video tag.