Laserfiche WebLink
<br />lbk-l TEXAS DEMOLITION / RENOVATION NOTIFICATION <br />DeptTwrtof FORM INSTRUCTION GUIDE <br />StaWHealEh Servtces <br />The Department of State Health Services Demolition/Itenovation Notification form combines the requirements ofthe National <br />Emission Standards for Hazardous Air Pollutants, 40 CFR, Subpart M(NESI-IAP) aitd the Texas Asbestos Health Protection <br />Rules (TAHPR). Both of these regulations require that written notification be submitted before beginning renovation projects <br />which include the disturbance of any asbestos-containing building material in a public building or the disturbance of the <br />NESHAP threshold amount of asbestos-containing material in a facility. A notification form is required before the demolition <br />of a building or facility, even when no asbestos is present. This form must be used to fulfill either orihese requirements. <br />Please call either 512-834-6610 or 1-800-572-5548 (within Texas), or your local regional office for assistance in completing <br />this fonn. <br />This form must be used whether you are notifying in accordance with NESHAP, TAHPR, or both. The notification fonn must <br />be postmarked at least ] 0 working days (not calendar days) prior to the project start date (except for emergencies or ordered <br />demolitions). Notifications that do not meet the 10-day requirement or are incomplete are considered to be "improper" and <br />may result in enforcement proceedings. If an item on the form is not applicable to the project iv question, you must write <br />"N.A." in that space, which shows that you have considered the item, but it does not apply to your operation. <br />INSTRUCTIONS <br />1) The contractor's name, address, aiid office phone number must be provided. The Department of State Health Services <br />(DSHS) Contractor License Number is required if the project falls under TAHPR. The contractor's address must <br />match that which was submitted on the DSHS license application, ifthe company has more than one office. The site <br />supervisor must be stated and the DSHS Supervisor License Number is oiily required for public building projects as <br />defined in TAHPR. Two site supervisors may be listed, if there are two work shifts, etc. For a demolition in which <br />the building does not contain asbestos, or in which the non-friable asbestos will not be removed prior to demolition, <br />write "N.A." in the spaces provided for the abatement contractor infonnation. <br />The trained on-site NESHAP individual and the certification date must be stated for NESHAP projects. The site <br />supervisor and the trained on-site NESHAP individual may be the same person, if qualified. List the individual's <br />name in both spaces. Since the DSHS License satisfies the requirements for NESHAP training, provide the <br />supervisor's name and DSHS License Number and write "N.A." in the spaces for the NES.HAP individual aiid <br />certification date. <br />The demolition contractor's name, address, and office phone number must be provided for all demolition projects. <br />An ame»dment must be submitted ifthe abatement contractor, the abatement supervisor, or the demolition contractor <br />is changed. <br />2) A DSHS licensed asbestos project consultant is required to design all asbestos response actions in public buildings. A <br />DSHS licensed asbestos project consultant is also required to design all asbestos abatement projects which involve <br />non-friable asbestos-containing building materials in quantities greater than 160 square feet, 260 linear feet, or 35 <br />cubic feet, in accordance with TAHPR. Provide all other information. The consultant's address must match that <br />which was submitted on the DSHS license application, ifthe company has more than one office. lftlie project is not <br />in a public building, the general contractor, or any other person who controls the project site, may be listed as the <br />"operAtor." <br />3) Provide information on the legal owner of the facility. The invoice for the notification fee will be sent to the owner of <br />the building and the billing address for the invoice will be obtained from the information that is provided in this <br />section. The company's name should be written on the first line. A specific person's name should be written <br />following "Attention..." on the second line. This person will be receiving the notification fee information. <br />4) Provide the name ofthe building or an identifying description. Example: vacant warehouse. A physical address must <br />» ODU21l <br />